Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Cook Projects Group drives customer savings with capacity increases

Compressors
Cook Projects Group drives customer savings with capacity increases

Cook Projects Group drives customer savings with capacity increases

Since 2001, the Cook Compression Projects Group has helped customers define efficiencies, improve reliability, advance safety, and realize OPEX and CAPEX savings. The group’s expertise lies in long-term, multi-functional projects that require comprehensive understanding of both equipment and processes – and that significantly affect the customer’s bottom line.

From the group’s more than 420 projects to date, here is just one example:

Achieving Capacity Increases with Existing Equipment

Late in 2016 the Cook Compression Projects Group was challenged with the task of identifying practical opportunities for an end user to free up one or more compressors in its fleet of 15+ identical operating compressors located across several sites. The compressor operators had noted that the units were at their capacity and mechanical limitations. Having spare or standby equipment would provide flexibility to plan and perform compressor maintenance without halting production, significantly improving up-time and operational reliability and reducing operating expenses for the plants.

The compressor OEM offered two options: add a new complete compressor train to each site or bore the cylinders oversized to increase the flow of each compressor. A technical review by Cook Compression identified a third solution: upgrade the existing compressors’ pistons, rods, valves and wear parts. The upgrade would leave the cylinder bore size the same, preserving the cylinder’s maximum allowable working pressure (MAWP). It would also eliminate the need to remove the cylinder for boring, saving valuable runtime.

Late in 2017, Cook Mechanical Field Services applied the upgrades to the first compressor. The two-day turnaround included installation of new piston and rod assemblies, new Manley® valves with suction unloaders, and rebuilt packing and wiper cases, as well as modifications to the compressor heads.

The customer’s equipment analyst has confirmed that the predicted ~2mmscfd (10%) increase in flow has been achieved, without exceeding the mechanical limits of the driver and compressor frame rod load limits. This 10% increase in flow per unit is enough for the end user to place one compressor at each site on standby and still meet the plants’ flow requirements.

Projects Group Introduces Effective Emissions Solutions

Another recent project on the U.S. West Coast addressed emissions reductions and engaged a continuum of customer contacts from the corporate Environmental Team leaders to the field processing plant personnel.

The Projects Group handled the installation of low-leak packing, as well as the documentation of compliance with current California EPA regulations and the training of on-site personnel.

Read About the Performance of the Low-Leak Packing

 

Related Articles

Compressor Maps in AFT Arrow

Compressor Maps in AFT Arrow

In AFT Arrow, a compressor map enables a more precise modeling of a centrifugal compressor junction across its complete range…

Related Whitepapers

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Driving Energy Savings a Commercial Facility Energy Upgrade Project

Upgrading to Design Envelope pumps helped GAC save energy costs of 20,000 AED in the first year. Armstrong’s Pump Manager service provides reports and notifications…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *