Brown and Caldwell were hired to design the reliability and process improvements project at a wastewater treatment plant. This plant is the linchpin of the wastewater treatment system providing a backup to other neighboring plants in cases of heavy flows, construction related bypassing, or emergencies. See how Maren Deal used AFT Arrow for the design and planning of the upgrades to the plant’s aeration system, as well as for the optimization of the existing operation.