Plant engineers sometimes ask how to best justify purchasing a precision laser alignment tool and training.  My first answer is usually to point to a pump in the plant, and say, “How much is the mechanical seal in that pump?”  Normally, the answer is a few thousand dollars.  To which I then say, “If you can save just a few seals from failing, you’ve paid for it”.

But if you really need to cost justify alignment, here are some things to consider:

  1. Is the machine production-related?  Will the whole plant or process be stopped?  Some coupled machines are directly involved with producing a product.  Certainly they are critical to production.  But there may be other processes, such as fire protection, HVAC, component cooling, hydraulics, etc.  They can also be important to the operation.
  2. If the coupling fails, what happens?  Will it destroy thousands of dollars in seals?  Bearings?  Shafting?
  3. How often do you replace the coupling insert?  Are there empty coupling insert boxes already in the trash can nearby?  I know coupling inserts are relatively inexpensive, but paying one or two mechanics to change it every few weeks IS NOT.
  4. There is often a slight amount of energy savings gained from performing precision alignment.  It depends on many things, but can be another factor in the purchasing decision.  Even though the industry average for cost savings from alignment is small,   the energy savings may still be enough to cover the maintenance labor cost of the alignment.

Reduced labor charged to the machine.  Improved MTBF.  Longer life from seals, bearings, and coupling inserts.  Reduced downtime.  Energy savings.

All good things!

For more information, visit VibrAlign.com

Related Articles

Taco Jamestown Island Home: A Case Study

Jamestown Island Home: A Case Study

Case Description A new 6,000-sq.-ft. waterfront home on the island of Jamestown, Rhode Island, was designed and built with energy efficiency…

Related Whitepapers

Climate Control and Extra Cargo Space: a Commercial Facility Case Study

The Armstrong Design Assist service reduced the required floor space for hvac equipment. The ipc 11550, delivered as part of a packaged system, automates the…

Upside Down Condos [Case Study]

This condo tower (324 units on 13 floors) had completed a previous retrofit that unfortunately left the variable speed pumps operating in a fixed mode…

Ras Al Khaimah saves 20% energy and 12% OPEX in wastewater pumping system

RAKWA is the RAK wastewater agency responsible for designing, building, operating, and maintaining all the public wastewater systems. Ras Al Khaimah—known as RAK—is the northernmost…

Intelligent Pumps Exceed Savings Estimates (Commercial Facility Installation Casestudy)

Design Envelope 6800 boosters reduced energy consumption by 76% compared to previous boosters, resulting in annual cost savings of $4,400 per system. Background The Heron’s…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *