Improving reliability with outsourced maintenance strategy

Compressors
Sulzer

Improving reliability with outsourced maintenance strategy

Contributor: Sulzer 

Plant maintenance is a highly skilled operation that requires considerable resources for unexpected repairs and long term planning for preventative maintenance programs. Large scale equipment, such as gas turbines, generators, compressors and large pumps, require specialist knowledge and expertise to maintain optimum performance. Increasingly plant owners are looking to outsource the major elements of equipment maintenance in order to improve reliability and minimize downtime.

Time is money and plant owners the world over aim to maximize productivity and minimize costs; central to this objective is avoiding unexpected breakdowns which can incur huge costs in terms of lost production. Implementing a robust preventative maintenance program is the first of many actions that can be taken to reduce the incidence of failure.

Sulzer

Overhaul projects require careful planning and execution

Depending on the equipment, a number of techniques, such as vibration analysis, thermal imaging, flow measurement and power consumption, can be used to indicate the initial stages of a concern. Recording this data also builds up a useful asset history which can be used to predict failures and enable intervention that minimizes repair times.

In many cases this low level monitoring will be carried out by the on-site engineers, while the data analysis may be conducted by an original equipment manufacturer (OEM) or similar product specialist, such as Sulzer. Once there is an indication that a repair is required, or a piece of equipment is scheduled for a predetermined overhaul, the aim is to implement a strategy that will minimize disruption and return the plant to normal operation as soon as possible.

Sulzer

Replacement parts can be manufactured ahead of refurbishment projects

Optimizing this process requires considerable planning, both in terms of manpower and spare parts. Specialist maintenance contractors can provide expert advice and practical assistance in preparing for a major plant service. Experience in these projects is essential to ensure the overhaul runs smoothly and on-site management can also be supplied in addition to the technical support.

In some cases, such as large gas turbines, the OEM may initially have a fixed contract to deliver a long-term service agreement (LTSA), however once this has expired the plant owner is free to continue with a similar arrangement or to engage an independent provider. In many cases the independent option is more attractive, especially in terms of response time and parts repairs which can be critical in returning the asset back to normal operation.

Sulzer

Long term maintenance planning reduces downtime

With such high value assets, it is common for plant owners to maintain a stock of spare components, either on their own premises or stored and managed by the independent maintenance partner. For example, spare rotors for compressors are usually held so that when a planned maintenance shutdown is carried out, the service rotor can be swapped out for the spare, minimizing downtime for the plant.

Once the compressor has been recommissioned, then the task of inspecting and repairing the rotor that was removed can be carried out. Again, the plant operator has a selection of providers to choose from and the scale of service will differ between them; some will provide a standard repair of damaged components, while others will offer the opportunity to improve performance and efficiency through improvements to the original design. 

Sulzer

Regular inspections and a robust preventative maintenance program improve productivity

The level of technical expertise also influences the ability of a maintenance provider to support a client in the event of an unexpected failure or forced outage. These events are a worst case scenario for a plant manager and it is essential that repairs are completed as quickly as possible. In order to achieve this, maintenance providers need to be able to deliver manpower and facilities at short notice.

Long term maintenance contracts offer several advantages and can be tailored to suit each client. From basic planning and project management through parts supply and repair to complete technical support including asset improvement and life extension, the level of support can be adapted to each set of circumstances. 

Sulzer

A full range of solutions can be tailored to fit the needs of every customer

For those taking advantage of these contracts they can provide a fixed budget for many aspects of the maintenance contract and improve maintenance strategy. Furthermore, the level of engineering expertise and facilities will reduce maintenance periods and minimize time lost for repairs. 

Asset management plays a crucial role in determining the reliability and performance of any industrial process. In many cases engaging an experienced and well-resourced maintenance partner, such as Sulzer, can improve project management, make repairs more cost effective and improve productivity while also providing a fixed cost basis that helps with budgeting. 

Sulzer’s expertise keeps your operations running like clockwork

Related Articles

Compressor Maps in AFT Arrow

Compressor Maps in AFT Arrow

In AFT Arrow, a compressor map enables a more precise modeling of a centrifugal compressor junction across its complete range…

Related Whitepapers

Five Reasons To Choose A Bearingless Torque Sensor

Benefits that improve your torque measurements Best real-world accuracy Highest Overload Highest Overrange

Advanced Sealing and Condition Monitoring Strategies In Water and Wastewater Plants

Introduction As a plant/maintenance manager or reliability engineer for a water or wastewater facility, you want to know about the best technologies to help your…

Downthrust Measurement in Vertical Pumps Prevents Failure: The Benefits of Measuring Axial Force in Real-Time

“Himmelstein’s Thrustmeter has proven to be accurate and repeatable, which are two of the main things that define quality in an instrument. It’s been a…

Electricity, Power, and Emissions: Using Motor Power Data to Create a Climate-Informed Maintenance Plan

Take Action Today To Make Your Pumps More Efficient Pump motor power levels and energy consumption provide valuable input about the status of and changes…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *