Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Precision Alignment and Paint Just Don’t Play Well Together

Maintenance & Reliability
Stan Riddle Precision Alignment and Paint

Precision Alignment and Paint Just Don’t Play Well Together

Contributor: Stan Riddle, VibrAlign, ACOEM Group

The VibrAlign trainers LOVE to go out into the plant, to conduct the field portion of our alignment training.  Since we’re all maintenance guys ourselves, we like getting our hands dirty. And in typical maintenance “bravado”, we don’t think there’s anything we can’t align-

-until we see something like this.

This plant was built in the 1960’s.  And it appears that this particular pump has experienced an annual paint job every year since!  Obviously, there was a good amount of clean-up to do. So, just for curiosity’s sake, I decided to measure the paint thickness on this shim with a micrometer.

Almost 50 mils of paint!  It was so thick on the bolt that we almost couldn’t get the right size wrench on it.

Stan Riddle Precision Alignment and Paint image 2How do you align a machine in this kind of mess?  You don’t. You MUST clean up first. Even if you throw away the painted shims, and start from scratch (which we did), you must clean up before you EVEN TRY to perform a precise alignment.

We chipped, scraped, and blew down the feet, base, and anywhere we needed a clean, flat surface, and started from scratch with new bolts.  Cleaning took 20 minutes, as did the alignment.

There is a quote, attributed to Abraham Lincoln, which says, “Give me six hours to chop down a tree, and I will spend the first four sharpening the axe”.  In this case, 20 minutes of cleaning made for a 20 minute alignment job..

Alignment Challenges on Small Positive Displacement Pumps

Related Articles

Related Whitepapers

Gas Turbine Design for a Turbopump

Today, rockets are used to transport satellites and humans into space. These rockets use a cluster of liquid-propellant engines to generate thrust in the lower…

Development of a 5,000 lbf Open-Cycle Kerosene-Oxygen Turbopump

Design of a kerosene-oxygen turbopump utilizing a conventional open-cycle system architecture sized to power a 5,000-lbf thrust chamber is described. A conservative design approach tolerant…

SEEPEX Switch Performance Guarantee

Replace any brand progressive cavity pump with a SEEPEX maintain-in-place Smart Conveying Technology (SCT) pump and receive a 3-Year Performance Guarantee on wear parts! SEEPEX…

Limited Time Offer – Pump and Macerator Rebuilding Services

SEEPEX is excited to announce that, in response to high demand, they are extending their Factory Rebuild Program at their service center in Enon, OH!…