Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Mueller Water Products is Building State-of-the-Art Brass Foundry in Decatur, IL

Industry News
Mueller Brass Foundry in Decatur, IL

Mueller Water Products is Building State-of-the-Art Brass Foundry in Decatur, IL

By: Mueller

Mueller Water Products is building one of the world’s largest modern finished goods brass foundries in Decatur, Illinois. The facility is expected to employ 250 workers to help increase production capacity and meet the growing within the water infrastructure industry.

Mueller was founded in Decatur, Illinois in 1857 by German immigrant Hieronymus Mueller. Building the new brass foundry in the same city that Mueller was born is a full circle moment in the company’s 162 years of history.

“We started Mueller here in Decatur in 1857 and have been lucky enough to be in business here for over 160 years, and we are very excited about this groundbreaking and putting this brand-new foundry here in Decatur,” said Senior Vice President of Sales and Marketing Chad Mize. “We believe this investment will allow our organization, as well as the city, to thrive for the next 160 years. This foundry is going to be one of the most modern, state of the art, brass foundries in the world.” 

 

Related Articles

Related Whitepapers

Arrow Powers Gas Turbine Analysis at Fern Engineering

Fern Engineering, Inc. was contracted by a major refinery to reduce the exhaust gas temperature variations of their gas turbine fleet. According to Hector Bourgeois,…

2027 DOE Efficiency Mandate & The Case for Higher Efficient Motors

The 2027 DOE motor efficiency requirements are bringing important changes to industrial motor applications. In this presentation, ABB’s Courtney Pickett and Stefanie Casimir break down…

ENKA Designs a State-of-the-Art District Heating System for Hamburg’s CHP Plant

Datacor Fathom provided the best solutions in terms of both heat transfer and pressure loss calculations.” – Kerem Algüzey, ENKA Industry: Power Generation Region: Hamburg,…

Refinery Cooling Water System Calibration Using Datacor Fathom

Hydrus Works, LLC needed to recalibrate a large refinery cooling water system containing nearly 600 pipes, 492 junctions, and 127 heat exchangers. Over 700 pressure,…