Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Low and No Cost Operational Measures [on-demand webinar from JKMuir]

JKMuir
Low and No Cost Measures for Water and Wastewater Treatment Plants [on-demand webinar by jkmuir]

Low and No Cost Operational Measures [on-demand webinar from JKMuir]

By: JKMuir

Opportunities to reduce energy usage and costs through low and no cost operational measures are abundant at most wastewater treatment plants. This 45-minute on-demand webinar focuses on opportunities for energy and cost savings that do not require large capital investment. Topics include control modifications and low-cost equipment replacement projects that are easy to implement and cost effective. A few control system modifications discussed include pump and blower optimization, demand control, wetwell level setpoints, VFD setpoints, and modifications to HVAC systems. Low cost equipment replacement opportunities, such as the replacement of defective and improperly sized valves, and the addition or replacement of instrumentation is also addressed. Specific examples from wastewater facilities are provided where no and low-cost energy saving operational measures have been identified and the resulting cost savings and return-on-investment were quantified.

Complete the form to watch the on-demand webinar now!

Related Articles

Related Whitepapers

How to Read a Pump Curve (and Why you Want to)

If you have ever worked with pumps before, be it in an installation, maintenance, or engineering capacity, chances are high you have seen a pump…

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *