Large Pillow Block and Pulley Avoid Removal in Mining Application with Bearing Isolators

Fluid Sealing
Inpro-Seal Large Pillow Block and Pulley Avoid Removal in Mining Application

Large Pillow Block and Pulley Avoid Removal in Mining Application with Bearing Isolators

Challenge

A large SDCD 23176 Pillow Block with a 14.173 in. (360 mm) shaft diameter was experiencing premature failure due to
contamination ingress of water, dust and bitumen. This was due to tremendous amounts of shaft misalignment and axial movement causing the seals on both sides to wear quickly. The customer would introduce significant amounts of grease into the seals to act as a purge and assist in sealing. This method had minimal results as the seals only lasted approximately three months.

Inpro-Seal Large Pillow Block and Pulley Avoid Removal in Mining Application (2)

Inpro/Seal Pillow Block Bearing Isolator Installation

Solution

Inpro/Seal® Bearing Isolators were installed on the inboard side of the pillow blocks. Inpro/Seal Bearing Isolators are
non-contacting compound labyrinth seals with no wearing parts that permanently protect bearings from contamination ingress or lubrication loss. These particular Bearing Isolators were flange mounted for easy installation and utilized an articulating rotor to handle angular misalignment and axial shaft movement.

Inpro-Seal Large Pillow Block and Pulley Avoid Removal in Mining Application (3)

Result

The seals were installed in April 2019 and have been running successfully with no contamination issues. The pillow block and pulley do not have to be removed due to constant premature failure, decreasing downtime and maintenance
costs. Due to the success of these seals, equipment maintenance can now be planned and scheduled.

Inpro-Seal Large Pillow Block and Pulley Avoid Removal in Mining Application (1)

Inpro/Seal Bearing Isolator installed on SDCD 23176 Pillow Block

Related Articles

Related Whitepapers

Arrow Powers Gas Turbine Analysis at Fern Engineering

Fern Engineering, Inc. was contracted by a major refinery to reduce the exhaust gas temperature variations of their gas turbine fleet. According to Hector Bourgeois,…

2027 DOE Efficiency Mandate & The Case for Higher Efficient Motors

The 2027 DOE motor efficiency requirements are bringing important changes to industrial motor applications. In this presentation, ABB’s Courtney Pickett and Stefanie Casimir break down…

ENKA Designs a State-of-the-Art District Heating System for Hamburg’s CHP Plant

Datacor Fathom provided the best solutions in terms of both heat transfer and pressure loss calculations.” – Kerem Algüzey, ENKA Industry: Power Generation Region: Hamburg,…

Refinery Cooling Water System Calibration Using Datacor Fathom

Hydrus Works, LLC needed to recalibrate a large refinery cooling water system containing nearly 600 pipes, 492 junctions, and 127 heat exchangers. Over 700 pressure,…