Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Ballast Water Management System installed onboard the PROVIDANA

Marine

Ballast Water Management System installed onboard the PROVIDANA

The 1000 m3/h installation of DESMI Ocean Guards CompactClean system was conducted in Chengxi Shipyard on the vessel Providana owned by Masterbulk Pte Ltd. The installation was a full integration of the system, which included:

  • A full 1000 m3/h CompactClean ballast water management system
  • An additional valve package and control system
  • Frequency converters on the ballast water pumps
  • Deck office operative system
  • Internet uplink system

Kevin Leach-Smith, Vice President, Operations, Masterbulk Pte Ltd:
“We chose DESMI’s CompactClean system because of the very small footprint and our trust in DESMI as a well-established supplier of marine equipment. An installation like this is a large project and requires good cooperation between the owner, technical manager, shipyard and system-supplier. All parties did a professional job in making this BWMS installation a smooth and efficient process.”

Ship’s name MV “PROVIDANA”
Ship type General cargo/Container Carrier/(DNV) I.D. no.26604
IMO number 9380788
Built OSHIMA Shipbuilding Co.,Ltd.-Japan / Ship Hull no.10508
Flag Singapore
LOA 212,5 meters
GT 39.258 MT
DWT 54.810 MT
Ballast cap. 17.833 MT

Read more about the DESMI CompactClean system

Related Articles

Related Whitepapers

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Driving Energy Savings a Commercial Facility Energy Upgrade Project

Upgrading to Design Envelope pumps helped GAC save energy costs of 20,000 AED in the first year. Armstrong’s Pump Manager service provides reports and notifications…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *