Ballast Water Management System installed onboard the PROVIDANA

Marine

Ballast Water Management System installed onboard the PROVIDANA

The 1000 m3/h installation of DESMI Ocean Guards CompactClean system was conducted in Chengxi Shipyard on the vessel Providana owned by Masterbulk Pte Ltd. The installation was a full integration of the system, which included:

  • A full 1000 m3/h CompactClean ballast water management system
  • An additional valve package and control system
  • Frequency converters on the ballast water pumps
  • Deck office operative system
  • Internet uplink system

Kevin Leach-Smith, Vice President, Operations, Masterbulk Pte Ltd:
“We chose DESMI’s CompactClean system because of the very small footprint and our trust in DESMI as a well-established supplier of marine equipment. An installation like this is a large project and requires good cooperation between the owner, technical manager, shipyard and system-supplier. All parties did a professional job in making this BWMS installation a smooth and efficient process.”

Ship’s name MV “PROVIDANA”
Ship type General cargo/Container Carrier/(DNV) I.D. no.26604
IMO number 9380788
Built OSHIMA Shipbuilding Co.,Ltd.-Japan / Ship Hull no.10508
Flag Singapore
LOA 212,5 meters
GT 39.258 MT
DWT 54.810 MT
Ballast cap. 17.833 MT

Read more about the DESMI CompactClean system. 

Related Articles

Related Whitepapers

Arrow Powers Gas Turbine Analysis at Fern Engineering

Fern Engineering, Inc. was contracted by a major refinery to reduce the exhaust gas temperature variations of their gas turbine fleet. According to Hector Bourgeois,…

2027 DOE Efficiency Mandate & The Case for Higher Efficient Motors

The 2027 DOE motor efficiency requirements are bringing important changes to industrial motor applications. In this presentation, ABB’s Courtney Pickett and Stefanie Casimir break down…

ENKA Designs a State-of-the-Art District Heating System for Hamburg’s CHP Plant

Datacor Fathom provided the best solutions in terms of both heat transfer and pressure loss calculations.” – Kerem Algüzey, ENKA Industry: Power Generation Region: Hamburg,…

Refinery Cooling Water System Calibration Using Datacor Fathom

Hydrus Works, LLC needed to recalibrate a large refinery cooling water system containing nearly 600 pipes, 492 junctions, and 127 heat exchangers. Over 700 pressure,…