Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Town of Hayden Trusts Barnes Pumps for New Waste Water Treatment Plant

Crane Pumps & Systems
Crane Pumps

Town of Hayden Trusts Barnes Pumps for New Waste Water Treatment Plant

The Barnes® Solids Handling Series The municipality in Hayden, Arizona has been purchasing Barnes pumps for the past 18 years from Pump Systems, Inc. in Gilbert, Arizona. So when the decision was made that the municipality would build their first ever waste water treatment plant they knew they wanted to purchase Barnes pumps.

The construction on the new Waste Water Treatment Plant and Waste Water Collection Systems was completed in five phases and is now almost ready to be turned over to the Town of Hayden. The plant will have a capacity of 80,000 gallons per day on average and 200,000 gallons per day peak daily flow. The plant has been built on 2.21 acres in town.

Gary Cruz, Operations Supervisor for the Town of Hayden met with David Donovan from Pump Systems, Crane Pumps & Systems Channel Partner to decide which pumps would best serve the town. They selected the Barnes solids handling series; Barnes 4SE, Barnes 3SE and Barnes 4SHV. The 4SE pumps are installed inside the plant and the 4SH pumps are being used after treatment to move the reuse water.

The ease of installation and confidence in the performance keeps the Town of Hayden loyal to the Barnes brand.

 

 

Related Articles

Crane variable speed frequency drives Quick Start Guide

VFD Quick Start Guide

Using variable speed/frequency drives on wastewater pumps can be tricky, but if the drives are sized and programmed properly, they…

Related Whitepapers

How to Read a Pump Curve (and Why you Want to)

If you have ever worked with pumps before, be it in an installation, maintenance, or engineering capacity, chances are high you have seen a pump…

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *