Bluefield Sanitary Board reduces surface temperatures with Envie3 Glycol Cooling System

Crane Pumps & Systems
Crane Bluefield Sanitary Board reduces surface temperatures with Envie3

Bluefield Sanitary Board reduces surface temperatures with Envie3 Glycol Cooling System

Application Overview

The City of Bluefield is one of the core cities that sits on the West Virginia/Virginia border. Serving a population of about 22,000 people, the Bluefield Sanitary Board is comprised of approximately 350 miles of sanitary sewer lines all leading back to two treatment plants. About 9.5 million gallons of sewer run through the two plants every day, with the Westside Treatment Plant treating 8.3 million gallons and the Ada Treatment Plant treating 1.2 million gallons.

Pump Station Details

Bluefield has 7 pump stations, all of which have had consistent problems with clogging issues, mechanical failures, and constant maintenance. The pump issues had become daily occurances, frequently hair and plastic would get stuck in the existing pumps. Each time a pump would clog or fail, it resulted in costly downtime for the treatment plant. Surrounded by mountains, the City of Bluefield prides itself on a community-oriented and safe atmosphere. With these daily issues, the Bluefield Sanitary Board knew that they needed to upgrade their equipment to live up to these promises to the community.

Crane Bluefield Sanitary Board reduces surface temperatures with Envie3 (1)

Installation

This was the perfect opportunity for Buchanan Pump Service & Supply Co, a local Barnes distributor, to step in and test a new solution for Bluefield. In February 2021, they installed an envie3 Non-clog Barnes pump in a triplex dry-pit station at the treatment facility. The pump is a 4” ESH 15HP non-clog with a maximum flow of 800GPM. With the help of the 4×6 base elbow, the envie3 was easily installed with minor piping changes from the original competitor. Since installation, the pump’s average daily run time has been 7 hours, starting approximately 8-12 times each day. The Bluefield team has noticed a significant reduction in surface temperature of this new pump in comparison to the other units in the station due to the envie3’s glycol cooling system. The max temperature that it has reach has been 90°F due to the pumping volume doubling on that specific occasion. Since installation, Bluefield has not experienced any issues with the envie3 pump. Due to the cooler surface temperature, reduced clogging issues with no occurrences since installation, and the easy installation, the Bluefield Sanitary Board is considering replacing the other units in the triplex station with the Barnes envie3. They are also planning to outfit the sister station with a Barnes solution as well.

Related Articles

Crane variable speed frequency drives Quick Start Guide

VFD Quick Start Guide

Using variable speed/frequency drives on wastewater pumps can be tricky, but if the drives are sized and programmed properly, they…

Related Whitepapers

How to Read a Pump Curve (and Why you Want to)

If you have ever worked with pumps before, be it in an installation, maintenance, or engineering capacity, chances are high you have seen a pump…

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *