Coupling Solution for an Induced Draft Fan Drive at a Large Power Plant

Power & Energy
Altra copyright_ ©rparys – Fotolia

Coupling Solution for an Induced Draft Fan Drive at a Large Power Plant

A major global industrial fan OEM needed a replacement coupling solution for an
induced draft fan drive at a large power plant. The fan maintains system pressure slightly
below atmospheric pressure on a coal-fired boiler at the facility. The existing fan drive used an old gear coupling design which had reached the end of its useful life.

The OEM contacted TB Wood’s based on many previous successful collaborations. The
customer requested a disc coupling solution since they wanted to increase expected service life and eliminate the need for lubrication. TB Wood’s engineers recommended switching to a Form-Flex floating shaft coupling to mount between the drive motor and the fan.

Altra coupling

The custom coupling was modified with limited end float features to keep the sleeve
bearing motor rotor from being damaged. The large 21.5 ft. long coupling is being used for an operating speed of 600 RPM, but the first critical speed is much higher due to the oversized tube diameter (24 in.) to meet the torsional requirements of the fan drive system.

The Form-Flex floating shaft has a continuous torque capacity of 1,100,000 lb.in. with a peak torque rating of 2,400,000 lb.in. The robust coupling design features an alloy steel motor hub with provisions for hydraulic removal, carbon steel flange adapter, welded steel spacer, high-strength alloy steel hardware and stainless steel disc packs.

Altra custom coupling

The new coupling required a shaft hub connection at the motor end and a special adapter
flange on the fan end to mate with the existing fan flange. Since this was a retrofit
application, axial adjustment shims were provided so the customer could fine tune the
coupling spacing on the job site

 

Related Articles

Related Whitepapers

Limited Time Offer – Pump and Macerator Rebuilding Services

SEEPEX is excited to announce that, in response to high demand, they are extending their Factory Rebuild Program at their service center in Enon, OH!…

Pump Motor Power …Times Four: How to Leverage Motor Power Across Varying Timelines to Protect and Optimize Pump Environments

Special purpose pump motor power sensors and controls have been available for over 25 years. Because power levels from pump motors relate directly to pumping…

Efficient Waste Handling Solution

Nature’s Way Foods needed a more reliable and hygienic way to remove fruit processing waste from high-care production areas. Frequent pump downtime and difficult-to-handle materials…

As Easy As ABC – Accurate Batch Control

Highly concentrated bakery ingredients demand precise, repeatable dosing to protect product quality and control costs. This case study highlights how A.B. Mauri achieved fast, accurate…