A Long Life Holdback Solution for a Coal-Fired Power Plant

Power & Energy
Altra Coal-Fired Power Plant

A Long Life Holdback Solution for a Coal-Fired Power Plant

The lip seal degradation on a large coal-fired power plant’s oil-lubricated holdbacks was experiencing problems. To prevent airborne contaminants from reaching internal seals and parts lip seals were designed. It became difficult for maintenance crews to keep up with the required lip seal lubrication schedule with multiple inclined and overland coal conveyor systems located throughout the facility. The resulting lip seal degradation led to an increase in costly downtime.

To solve the problem, new grease-filled Formsprag LLH (Long Life Holdback) models were installed as replacements to older Formsprag and competitive oil-lubricated units. The facility manager expects a significant improvement in productivity since maintenance will not be required on the new LLH units as they already use grease lubrication (grease used for both internal lube and grease labyrinth seal areas).

LLH Series backstopping clutches are designed for use on conveyor head shafts, bucket elevators, or any other machinery where reverse rotation must be positively prevented. LLH units come ready to install and are equipped with a one-piece, quickly detachable torque arm.

A variety of LLH model sizes are utilized at the facility with torque capacities ranging from 4,000 to 700,000 lb.ft. (952000Nm) and maximum overrunning speeds from 130 to 400 RPM. The largest units are mounted on two conveyor systems with 60” wide belts that move 1,100 tons/hr on each belt.

Altra Motion Formsprag LLHHighlights

  • Oil lubed LLH holdback replaced with grease lubricated models
  • Reduced maintenance and downtime
  • Eight older Formsprag and competitor units replaced
  • Torque capacities ranging from 4,000 to 700,000 lb.ft. (952000Nm)
  • Maximum overrunning speeds from 130 to 400 RPM

 

Related Articles

Related Whitepapers

Arrow Powers Gas Turbine Analysis at Fern Engineering

Fern Engineering, Inc. was contracted by a major refinery to reduce the exhaust gas temperature variations of their gas turbine fleet. According to Hector Bourgeois,…

2027 DOE Efficiency Mandate & The Case for Higher Efficient Motors

The 2027 DOE motor efficiency requirements are bringing important changes to industrial motor applications. In this presentation, ABB’s Courtney Pickett and Stefanie Casimir break down…

ENKA Designs a State-of-the-Art District Heating System for Hamburg’s CHP Plant

Datacor Fathom provided the best solutions in terms of both heat transfer and pressure loss calculations.” – Kerem Algüzey, ENKA Industry: Power Generation Region: Hamburg,…

Refinery Cooling Water System Calibration Using Datacor Fathom

Hydrus Works, LLC needed to recalibrate a large refinery cooling water system containing nearly 600 pipes, 492 junctions, and 127 heat exchangers. Over 700 pressure,…