Braking Systems Solution For Dam Gates

Motors & Drives
Altra Series 600 Braking Systems Dam Gates

Braking Systems Solution For Dam Gates

The Pont Barrage de Monsin combination dam and bridge spans the Muese River in Liege, Belgium. The dam’s hydroelectric power plant generates up to 18 MW of electricity. Six 27 m wide, 110 ton steel gates, are utilized to control the river’s flow. As part of a major refurbishment approved in 2018, two of the six gates were updated along with their associated mechanical drive components located in three of the dam’s lifting towers. Four complete mechanical packages, each including a gearmotor, brakes, disc, torque limiter and coupling were required for the upgrade.

Based on years of successful collaboration with Altra Motion brands, the project’s mechanical contractor contacted Stromag for a reliable service braking solution. Upon review of the braking torque requirements, Stromag recommended Model 660 failsafe spring set, electromagnetically released caliper brakes. Each brake provides .45 kNm (332 lb.ft.) of torque.

Stromag AC64-50CP electrical power units were also provided. These compact units are designed to support two disc brake calipers and feature IP66-rated enclosures. 175 mm dia. brake discs were also supplied.

Highlights
Altra sg-series-600-brake• Model 660 failsafe spring set, electromagnetically released caliper brakes
• .45 kNm (332 lb.ft.) torque rating
• C64-50CP electrical power units with IP66-rated enclosures
• 175 mm dia. brake discs

Learn about more braking solutions from Altra Industrial Motion!

On March 27, 2023, Altra Industrial Motion was acquired by Regal Rexnord Corp. Learn more about this here.

Related Articles

Related Whitepapers

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Driving Energy Savings a Commercial Facility Energy Upgrade Project

Upgrading to Design Envelope pumps helped GAC save energy costs of 20,000 AED in the first year. Armstrong’s Pump Manager service provides reports and notifications…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *