Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Water pumped off New Zealand Highway in time to Build Ocean Wall

AllightPrimax
AllightPrimax

Water pumped off New Zealand Highway in time to Build Ocean Wall

The North Canterbury Transport Infrastructure Recovery (NCTIR) in New Zealand worked with AllightSykes to quickly pump water off State Highway 1 between Blenhiem and Kaikoura, which are areas often affected by earthquakes.

NCTIR’s main objective was to build a concrete retaining wall a little over half a mile long to safeguard the highway from ocean overflow. They contacted AllightSykes about a high volume pump that could remove existing water off the road quickly, so that concrete could be poured within a challenging time frame – in between tides!

Read the whole story!

https://empoweringpumps.com/products/sw150-pumpset/

Related Articles

Related Whitepapers

As Easy As ABC – Accurate Batch Control

Highly concentrated bakery ingredients demand precise, repeatable dosing to protect product quality and control costs. This case study highlights how A.B. Mauri achieved fast, accurate…

Pump Maintenance Mistakes Checklist

A pump is an expensive piece of any water system. Maybe not the most expensive, but certainly not the least. However, only a small fraction…

Selecting the Right Bearings to Improve Vertical Turbine Pump Reliability

Selecting the Right Bearings to Improve Vertical Turbine Pump Reliability Vertical Turbine Pumps (VTPs) are available in a variety of configurations and are used for…

Torque Measurement Precision: Why the Overload vs. Overrange Distinction Matters for Quality Control

Why properly understanding and differentiating between overload and overrange helps to maintain the accuracy and longevity of the torque meter. Two easily overlooked, yet extremely…