The North Canterbury Transport Infrastructure Recovery (NCTIR) in New Zealand worked with AllightSykes to quickly pump water off State Highway 1 between Blenhiem and Kaikoura, which are areas often affected by earthquakes.
NCTIR’s main objective was to build a concrete retaining wall a little over half a mile long to safeguard the highway from ocean overflow. They contacted AllightSykes about a high volume pump that could remove existing water off the road quickly, so that concrete could be poured within a challenging time frame – in between tides!
https://empoweringpumps.com/products/sw150-pumpset/
Comments