Urgent Pump Solution A Big Mine Site Success.

AllightPrimax
AllightPrimax

Urgent Pump Solution A Big Mine Site Success.

Contributor: AllightPrimax

One of the largest iron ore miners in WA urgently needed a powerful pump to flush out a slurry line. With an extremely tight lead time, the dewatering experts at AllightSykes were perfectly placed to provide the long-term solution.

“With the slurry line blocked, the client needed a pump onsite immediately. After looking at the situation and identifying that our HH220 pump unit was perfect for the job, the first thing we did was to facilitate the cross-hire of a similar unit from our sister company, Coates Hire,” said Bill Jones, AllightSykes Regional Sales Manager WA.

The hire unit got the job done in the short term, but the client needed a sustainable on-site solution and ordered their own AllightSykes HH220 pump to the same specifications.

“While the new pump was being built and tested by AllightSykes NSW, the client’s crew onsite in the Pilbara had designed their pipeline manifold system around the cross-hire unit. Therefore, our manufactured unit needed to have the exact same footprint as the hire pump,” explained Bill.

The install and up-fits of the capital unit, plus commissioning of the pump and site training was carried out by Chris O’Brien at the AllightSykes Cardiff facility.

“The project required a 450mm suction pipe and discharge hose with eccentric/concentric reducers to exactly fit the in-situ manifold system,” said Chris. “These requirements were so exact, it needed to pass a significant factory acceptance test (FAT) at our yard. After seeing the results of the test, the comment from the client was that they have ‘never had a pump hit all duty point on test’.”

The build and delivery of both the hire pump and the capital pump was managed to the hour. Everything from the factory acceptance test, delivery, installation, commissioning and all supporting documentation was delivered on time and within budget parameters. It was a complete success,” continued Bill, proudly.

AllightPrimax“The client was very happy that the project was delivered on time and exactly to their specifications. They also mentioned that the FAT had clearly demonstrated the capability of the pump and thanked our team for all the support provided at site during commissioning.”

“The client appreciated the quick and decisive actions that we took to address delivery issues with the tailored hoses, and also the management support needed to respond to their strict QA requirements,” said Bill.

For more information on AllightSykes’ pump solutions and large-scale dewatering expertise,email bill.jones@allightsykes.com or explore our range of pumps.

https://empoweringpumps.com/allightprimax-on-site-training-is-all-part-of-allightprimax-service/

Related Articles

Related Whitepapers

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Driving Energy Savings a Commercial Facility Energy Upgrade Project

Upgrading to Design Envelope pumps helped GAC save energy costs of 20,000 AED in the first year. Armstrong’s Pump Manager service provides reports and notifications…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *