Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Armstrong Unveils New IPS 4000 Controller for Multi- pump Installations with Variable Load Demands

Armstrong

Armstrong Unveils New IPS 4000 Controller for Multi- pump Installations with Variable Load Demands

Armstrong Fluid Technology has announced the release of its new Integrated Pumping System (IPS 4000), an automation solution for commercial HVAC pumping stations of up to 8 pumps and 16 zones.

The new IPS 4000:

  • Automates and optimizes multi-pump installations in a range of different plant configurations
  • Provides sequences for variable-primary, secondary or tertiary pumping system applications
  • Delivers leading energy savings, with patented Parallel SensorlessTM pump staging technology

Pre-configured to leverage the capabilities of Design Envelope, the technology embedded in Armstrong pumps, the new IPS 4000 offers fast and simple setup for the most cost-effective and efficient pump control results. The IPS 4000 is compatible with existing building automation systems and ships pre-programmed for easy installation and set-up.

Commenting on the value provided by the new IPS 4000, Peter Thomsen, Director, Building Systems Solutions, stated, “The new IPS 4000 is a great control and automation solution. In particular, it will add value in any building that has short peak loads or that needs a hybrid solution to provide both Sensorless staging and critical zone sensors.”

About Armstrong Fluid Technology – With over 1000 employees worldwide, operating seven manufacturing facilities on four continents, Armstrong Fluid Technology is known as an innovator in the design, engineering and manufacturing of intelligent fluid flow equipment. With expertise in demand-based control, digitalization, fluid flow, and heat transfer, Armstrong Fluid Technology leads the fluid systems industry, including HVAC, plumbing, and fire safety, providing the most energy-efficient and cost-effective solutions to building professionals and owners around the world.

The energy savings provided by Armstrong solutions support the company’s “2 By 22”initiative – a commitment to reduce GHG among its installed customer base, targeting 2 million tons by the year 2022. The company also issued a challenge to industry participants to set similarly aggressive targets for the same 4-year time-frame. Armstrong has been working with customers to convert existing installations, and the initiative is on pace to reach the target.

 

Related Articles

Related Whitepapers

Arrow Powers Gas Turbine Analysis at Fern Engineering

Fern Engineering, Inc. was contracted by a major refinery to reduce the exhaust gas temperature variations of their gas turbine fleet. According to Hector Bourgeois,…

2027 DOE Efficiency Mandate & The Case for Higher Efficient Motors

The 2027 DOE motor efficiency requirements are bringing important changes to industrial motor applications. In this presentation, ABB’s Courtney Pickett and Stefanie Casimir break down…

ENKA Designs a State-of-the-Art District Heating System for Hamburg’s CHP Plant

Datacor Fathom provided the best solutions in terms of both heat transfer and pressure loss calculations.” – Kerem Algüzey, ENKA Industry: Power Generation Region: Hamburg,…

Refinery Cooling Water System Calibration Using Datacor Fathom

Hydrus Works, LLC needed to recalibrate a large refinery cooling water system containing nearly 600 pipes, 492 junctions, and 127 heat exchangers. Over 700 pressure,…