[Training Seminar] Motor/ Pump System Optimization: Improving Reliability & Reducing Down Time

Industry News
TRAINING SEMINAR - Motor/ Pump System Optimization: Improving Reliability & Reducing Down Time

[Training Seminar] Motor/ Pump System Optimization: Improving Reliability & Reducing Down Time

 

Training Seminar

Thursday, November 17th, 2016
8:30 a.m. – 4:30 p.m. EST

Challenges in the areas of energy and the environment can be met not by doing without technology but rather by continuing to develop it to save energy and protect the environment in other words by developing more efficient technologies.” ~James Rogers, former CEO and President of Duke Energy

DO YOU KNOW…

Renewable energy is wreaking havoc on the grid. Solar and wind power are intermittent sources that rely on carbon-emitting natural gas as a backup fuel when the weather isn’t cooperating. Moreover, wind requires 360 times as much land area to produce the same amount of electricity as a nuclear plant, and solar requires 75 times the land area.

America’s use of coal for electricity dropped to its lowest point in the historical record in 2015, delivering a new blow to an industry already in painful decline. It was the smallest share for coal in the electricity mix since 1949, the first year in which Energy Information Administration records were kept. Coal made up 39% of electricity supply in 2014, the annual report said.

Coal fired power plants are now forced to swing load impacting plant reliability.

The electric power industry is capital intensive it is spending approximately $75 billion per year for major transmission, distribution, and smart grid system upgrades; new, cleaner generation capacity; and environmental and energy-efficiency improvements.

Electric companies are investing in energy efficiency and are promoting innovative options for making energy efficiency part of their business model (demand and generation).

The Energy Information Administration expects coal plant closures to reach 90 gigawatts by 2020 (enough to deliver reliable power to 73 million homes).

Last year 3,600 megawatts of nuclear-generating capacity were closed down, compared with 4,500 megawatts of coal power.

There is no avoiding the fact that more fossil fuels will be used for power production to compensate for the loss of nuclear power. Renewables and improvements in energy efficiency alone won’t meet energy requirements.

What does this mean to WEG / Electric Machinery and our Valued Channel Partners? OPPORTUNITY!!!

Register for the webinar to learn more about the power generation industry and how WEG / Electric Machinery and Channel Partners can better position ourselves in the rapidly changing power generation industry, VALUE ADDED SERVICE!!!!! We (WEG/EM) have the solutions, the trick is how to make the business case.

Course Focus

This informative one-day workshop will show you how to:

  • Reduce energy costs
  • Improve system reliability (Motor, Drive, Pump)
  • Increase mean time between repairs
  • Reduce fugitive emissions
  • Increase staff productivity
  • Improve product quality
  • Increase profitability

Presenter: William C. Livoti, Bus. Dev. Mgr., Power Generation, for WEG Electric Corp. with over 30 years of experience in the pump industry designing, field testing, repairing & troubleshooting mechanical seals, compressors & pumping systems. Past experience working for Pump & Mechanical Seal OEM’s as well as Corporate Principal Engineer for a large power utility company. He was accountable for asset management, life cycle performance, system assessment, failure analysis, plant efficiency, O&M & capital budget. He has co-authored 2 books with the Hydraulic Institute, Pumps System Optimization Guide Lines and Power Plant Pump Application Guide Lines. He is a member of Vibration Institute, IEEE Power Engineering Society & Electric Power Research Institute Large Electric Motor Users Group.

Who should attend? This workshop is intended for design engineers, facility managers as well as engineering, operations and maintenance personnel that are involved with the design, selection, installation, maintenance, operation and optimization of pumping systems.

Deliverables:

  • PSIM (Pump System Improvement Modeling Tool) / PSMART Modeling Tool
  • LCC Calculator (Tool)
  • System Efficiency / Friction Loss Spread Sheet / Specific Speed (Tool)
  • Valve Tool
  • Variable Frequency Drive / Motor selection / application / Troubleshooting Guide
  • Pump System Optimization Guide Book
  • Hard copy of Pump System Optimization, Improving Reliability / Reducing Down Time Training Manual
  • Continuing Education Credits:
    • 7 PDH hours (Professional Development Hours) licensed Engineers
    • Upon request – CEU Credits through Washington University (WWW Plant Operators)

Only 32 Spots Left! REGISTER TODAY!

Related Articles

Related Whitepapers

Performance Prediction: A Unique Approach for the Aftermarket

Hydro’s software has allowed CFTurbo to improve the optimize the performance of equipment and its fit to its system to make dramatic efficiency and reliability…

Corrective vs. Preventive Maintenance: Which is Better?

Corrective Maintenance This is performed only after a failure occurs in the equipment, which can lead to unexpected downtime and costly repairs. Although it is…

Torque Sensors For Any Application

This guide from S. Himmelstein & Company details their torque sensor solutions, designed to meet the demands of any industry. Learn about: Ultra-Precise Spline Drive…

What is Water Hammer and Why It Is Important to Prevent?

Water hammer (or hydraulic shock) is the momentary increase in pressure inside a pipe caused by a sudden change of direction or velocity of the…