Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Val-Matic Plug Valves enter the UK MARKET

Industry News

Val-Matic Plug Valves enter the UK MARKET

Val-Matic entered the United Kingdom market on a major project for Thames Water. The project involved an upgraded contract worth more than US$189 million at the Crossness Sewage Treatment Plant in east London. The improvements enabled the site to treat 44% more sewage than before, significantly reducing the amount of storm sewage that overflows into the River Thames. Thames installed Val-Matic® Cam-Centric Plug Valves in a full range of sizes for the primary settlement tank, desludge and aeration applications. Val-Matic Cam-Centric Plug Valves maintained the ability to withstand the harsh process environment, with its hard wearing and non-stick fusion bonded epoxy coating, coupled with a unique bearing packing including Grit-Guard seals to assure a tight seal and trouble-free service.

The Val-Matic Cam-Centric Plug Valve is a 1/4 turn valve allowing cost effective, low torque actuation for shut-off and throttling service. Val-Matic Cam-Centric® Plug Valves meet AWWA C517 and are WQA Certified Lead-Free. To read this full article, please visit the articles tab at www.valmatic.com.

Related Articles

Related Whitepapers

Climate Control and Extra Cargo Space: a Commercial Facility Case Study

The Armstrong Design Assist service reduced the required floor space for hvac equipment. The ipc 11550, delivered as part of a packaged system, automates the…

Upside Down Condos [Case Study]

This condo tower (324 units on 13 floors) had completed a previous retrofit that unfortunately left the variable speed pumps operating in a fixed mode…

Ras Al Khaimah saves 20% energy and 12% OPEX in wastewater pumping system

RAKWA is the RAK wastewater agency responsible for designing, building, operating, and maintaining all the public wastewater systems. Ras Al Khaimah—known as RAK—is the northernmost…

Intelligent Pumps Exceed Savings Estimates (Commercial Facility Installation Casestudy)

Design Envelope 6800 boosters reduced energy consumption by 76% compared to previous boosters, resulting in annual cost savings of $4,400 per system. Background The Heron’s…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *