Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Why BESS? Community and Industrial Battery Storage Back-Up

Oil & Gas
TECO Why BESS Community and Industrial Battery Storage Back-Up

Why BESS? Community and Industrial Battery Storage Back-Up

By: TECO

Battery Energy Storage Systems (BESS) are gaining popularity. With capabilities to support on and off-grid sites, the primary purpose of an installed BESS is to store more energy, improve energy efficiency and provide direct access to on-site energy. BESS applications are used at oil and gas sites, as well as diversification of utilities. Coupled with renewable energy such as Wind and Solar, BESS, compliments the overall “green” carbon reduction objectives for businesses and communities. Why is BESS the big topic right now?

  • Tool for Profit: Depending upon available utility incentives, overproduction of energy for businesses and communities provide the ability to sell back additional power to the grid. This helps diversify energy generation, and provides income stream for BESS owner.
  • Used at On-grid and Off-grid Sites: Power outages appear to be a thing of the present. Just ask residents in Texas, Louisiana, New York, California (among others). Harsh weathering and remote areas call for on-site storage to run operations and support communities with back-up storage in times of emergency.
  • Coupling Capabilities: BESS can be used in conjunction with traditional oil and gas sites and utilities, as well as newer renewable energy technologies such as Wind, Hydro-electric and Solar. In locations with high levels power output, BESS a type of retrofit solution for immediate power accessibility.

Related Articles

Related Whitepapers

Gas Turbine Design for a Turbopump

Today, rockets are used to transport satellites and humans into space. These rockets use a cluster of liquid-propellant engines to generate thrust in the lower…

Development of a 5,000 lbf Open-Cycle Kerosene-Oxygen Turbopump

Design of a kerosene-oxygen turbopump utilizing a conventional open-cycle system architecture sized to power a 5,000-lbf thrust chamber is described. A conservative design approach tolerant…

SEEPEX Switch Performance Guarantee

Replace any brand progressive cavity pump with a SEEPEX maintain-in-place Smart Conveying Technology (SCT) pump and receive a 3-Year Performance Guarantee on wear parts! SEEPEX…

Limited Time Offer – Pump and Macerator Rebuilding Services

SEEPEX is excited to announce that, in response to high demand, they are extending their Factory Rebuild Program at their service center in Enon, OH!…