
Tube Layout Pattern, Tube Spacing and Design Delta T. Taco Comfort Solutions covers two topics here: hydronic radiant floor design considerations…
This condo tower (324 units on 13 floors) had completed a previous retrofit that unfortunately left the variable speed pumps…
![TACO KPMG Office Building [Case Study]](https://empoweringpumps.com/wp-content/uploads/2023/09/TACO-KPMG-Office-Building-Case-Study-380x199.png)
Case Description Henk Soeterboek, former engineering director for Omni B.V., a local mechanical engineering and installation !rm in Willemstad on the…
Design Envelope 6800 boosters reduced energy consumption by 76% compared to previous boosters, resulting in annual cost savings of $4,400…

Case Description Florida State University is a growing campus of almost 500 acres in Tallahassee, the state capital. As new buildings…
Florida Power & Light upgraded their existing hvac system to use Armstrong Design Envelope pumps. As a result they have…
After a major refurbishment to guest suites and event spaces, managers at the Park Hyatt hotel wanted to improve heating…

Armstrong Fluid Technology has relocated its sales office from Mannheim, Germany, to a larger site in Frankfurt to support the…

OPTI-visor™ is an add-on control solution that advises a BMS system on optimal speed settings for the operation of HVAC…

Truck Manufacturing Facility Armstrong designed and built a retrofit chiller plant. The installation uses the Armstrong OPTI-VISOR for plant optimization, plus…
The Greening of America’s Buildings The growing green movement has led to a flood of new standards including the US…