Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Pump Solutions Group’s (PSG®) Finder Pompe Appoints Lorenzo Barbieri CEO

Industry News

Pump Solutions Group’s (PSG®) Finder Pompe Appoints Lorenzo Barbieri CEO

By: PSG

Finder Pompe, which recently became part of Dover Corporation’s Pump Solutions Group (PSG®), is pleased to announce that it has named Lorenzo Barbieri to the position of CEO. In this position, Barbieri will report directly to PSG President Dean Douglas.

“I am very excited to have Lorenzo leading Finder,” said Douglas. “His extensive knowledge of the Oil & Gas market, as well as Finder’s commercial, manufacturing and engineering operations, will ensure a successful transition forward. His direction and leadership skills will help inspire the Finder team to work in harmony while driving the company to achieve growth and improved performance.”

Barbieri joined Finder in 2010 and led Finder’s service organization as the Vice President of After-Sales Business and the Deputy General Manager of the Querceta, Italy-based facility. During this time, Barbieri was heavily focused on driving strategic initiatives and growth at Finder. Prior to joining Finder, Barbieri was the Business Leader of the heavy wall reactors business unit of General Electric (GE) Oil & Gas.

Headquartered in Merate, Italy, Finder is a leader in the design and manufacturing of API engineered pumps and systems for the global energy market, primarily Oil & Gas. Finder has operations in Merate and Querceta, Italy, and Venissieux, France, as well as a network of representation in more than 75 countries around the world.

Related Articles

Related Whitepapers

Arrow Powers Gas Turbine Analysis at Fern Engineering

Fern Engineering, Inc. was contracted by a major refinery to reduce the exhaust gas temperature variations of their gas turbine fleet. According to Hector Bourgeois,…

2027 DOE Efficiency Mandate & The Case for Higher Efficient Motors

The 2027 DOE motor efficiency requirements are bringing important changes to industrial motor applications. In this presentation, ABB’s Courtney Pickett and Stefanie Casimir break down…

ENKA Designs a State-of-the-Art District Heating System for Hamburg’s CHP Plant

Datacor Fathom provided the best solutions in terms of both heat transfer and pressure loss calculations.” – Kerem Algüzey, ENKA Industry: Power Generation Region: Hamburg,…

Refinery Cooling Water System Calibration Using Datacor Fathom

Hydrus Works, LLC needed to recalibrate a large refinery cooling water system containing nearly 600 pipes, 492 junctions, and 127 heat exchangers. Over 700 pressure,…