OverWatch® Tackles AOD Pump Clogging Issues at a Major Wastewater Plant in Georgia

Industrial Flow Solutions
IFS OverWatch® – Clogged AOD pumps plague a Wastewater Plant in a large municipality in Georgia

OverWatch® Tackles AOD Pump Clogging Issues at a Major Wastewater Plant in Georgia

Overview:

The initial wastewater treatment system for the city featured three air-operated diaphragm (AOD) pumps allocated to each of the eight scum houses, totaling 24 AOD pumps responsible for removing scum and debris from the surface of the secondary clarifiers. The scum and debris constantly clogged the pumps. Additionally, during each power outage at the plant, additional clogs occurred when the solenoid valve (that controls the water fed into the pumps) became out of sync and resulted in downtime.

The city spent considerable time, labor, and money on the unscheduled maintenance at least four times weekly.

Eventually, these challenges caused the pumps to stop running, which led to a buildup in the piping and a solid layer formed on the clarifiers.

The plant needed a pump system capable of handling dirt, grit, and debris while maintaining sufficient capacity/flow for optimal pump performance, despite power outages.

Solution:

A duplex OverWatch® system was customized & installed to manage the scum layer for the two clarifiers and eliminated clogged pumps, improved operational efficiency, and reduced costly maintenance events. The system was designed with elongated legs to fit the existing footprint, and the control panel includes dry contacts to enable the solenoid valve operation using a mechanical timer that solves the power outage issue.

Adjustments to increase pump operation and efficiency:

  • Minimum frequency was modified to prevent deadheading the pumps, ensuring the proper flow
  • Ramp-up speed, or acceleration time, was increased for each pump, allowing the system to stabilize and avoid potential airlock issues
  • Pumps were set to operate in a linear on/off mode, as flow was not frequent
  • Scaling of the level sensor was adjusted to ensure accuracy when reading the liquid level.

Since the OverWatch® system was installed:

  • ZERO maintenance events
  • ELIMINATED scum layer present on the secondary clarifier
  • ZERO distribution to the solenoid valve time due to power outages
  • INCREASED operator

Next Steps – Seven additional OverWatch® systems are being installed throughout the wastewater plant.

Related Articles

Related Whitepapers

How to Read a Pump Curve (and Why you Want to)

If you have ever worked with pumps before, be it in an installation, maintenance, or engineering capacity, chances are high you have seen a pump…

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *