Hydro’s Successful Hydraulic Rerate Project: Enhancing a Major US Midstream Pipeline’s Efficiency

Hydro
Hydro's Successful Hydraulic Rerate Project Enhancing a Major US Midstream Pipeline's Efficiency

Hydro’s Successful Hydraulic Rerate Project: Enhancing a Major US Midstream Pipeline’s Efficiency

Custom Hydraulics for the Midstream Market

During the summer season, Hydro successfully executed a hydraulic rerate project for a significant US midstream pipeline. The project was completed through Hydro South, Hydro’s southeastern US service center in Alpharetta, Georgia. The project was completed with testing support from the Hydro Performance Test Lab, Hydro’s 5000 HP test facility located in Chicago, IL, with engineering direction from Hydro Global Engineering, based in Manchester, UK.

The pipeline originally used two booster pumps and the use of a Drag Reducing Agent (DRA) to achieve the desired flow rate. To increase the overall flow capacity of the line and remove the need for the DRA, the end user specified a pump to be added to the system downstream of the booster pumps.

The pump performance specifications were developed by system engineers and communicated to Hydro. The pump’s original design condition was modified to provide the necessary differential pressure required for the desired flow rate – for today and in the future. This will be achieved without the use of DRA or with little added to the system.

Hydro's Successful Hydraulic Rerate Project Enhancing a Major US Midstream Pipeline's Efficiency (1)Hydro modified an existing pump casing provided by the pipeline and designed new impellers to meet the specific hydraulic performance requirements. Using computational fluid dynamics and advanced modeling, the new impellers were manufactured and installed by Hydro, then sent to Hydro’s test facility for hydraulic performance testing.

To provide an exact performance match, a larger impeller diameter size was selected for the first test and subsequently trimmed to meet performance within API 610 tolerances. Along with the hydraulic performance test, the mechanical integrity of the pump was measured with a vibration test, mechanical resonance test, and a bearing housing temperature stabilization test. All this information validates the quality of the rebuild and ensures a reliable machine.

The pipeline has a limited ‘budget’ of DRA concentration allowed pipeline wide. This concentration is measured in part per million (ppm). By adding the hydraulically rerated pump to the branch line, the DRA ppm budget can be allocated elsewhere in the pipeline. This will add efficiency and increase overall throughput.

Hydro is very fortunate to support critical industries like midstream pipelines in ensuring safe, reliable, and cost-effective pumps and rotating equipment.

Learn more about Hydro’s Performance Test Lab and Engineering Services

Related Articles

Related Whitepapers

CFturbo BLADERUNNER Centrifugal End-Suction Pump Casestudy

The CFturbo BLADERUNNER 2024 is a unique and innovative tool that will outperform the known capabilities of an automated simulation process for Turbomachinery performance maps.…

Defeat The Enemies That Interrupt Your Water/Wastewater Operation

Download ABB’s new playbook to help you identify and defeat the enemies that interrupt your water/wastewater operation and learn how you can… • Reduce operational…

Sodium Hypochlorite Service Success with NETZSCH PERIPRO®

Sodium hypochlorite (NaOCl) is widely used by municipal water treatment plants Sodium hypochlorite (NaOCl) is an effective water disinfectant to treat the raw, filtered water…

Tips for the Installation of MCRT® Torquemeters

An MCRT® torquemeter must be installed properly as an integral part of a drive line network in order to achieve satisfactory operation. Proper installation will:…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *