Form-Flex® Composite Floating Shafts Water Pumping Station

Regal Rexnord
True Tube

Form-Flex® Composite Floating Shafts Water Pumping Station

Engineers at a large raw water pumping station in Malaysia asked TB Wood’s to consult with them on vibration problems with their existing vertical drive trains on the nine pumps in their station.

The facility was originally built using competitor 4-section shafts which yielded recurring vibration problems. 4-section U-Joint shafts were installed later in hopes of solving the problem when four of the pumps were upgraded. There was extreme vibration on these four units; worse than anything they had before. Things were so bad that no more than 4 or 5 of the 9 pumps could be run at a time and some with U-Joints could never be run. The reduced pumping capacity created local drinking water shortages.

After careful analysis of the application, TB Wood’s recommended a custom designed, 3-section, Form-Flex® Composite driveshaft to replace the (four) 4-section U-Joint shafts. The upper and lower sections of the TB Wood’s shafts used 7” diameter tubing. The center section used 14” tubing to span past the center-floor bearing location where the problem vibration had been most severe.

An initial single TB Wood’s shaft replacement performed to expectation with little vibration and was accepted by the client, who acknowledged that TB Wood’s design and engineering proficiency contributed significantly to achieve the substantial improvement in the station’s pumping capacity. Thus far, TB Wood’s has received orders for three additional drive train replacements.

Protrac Kampong Installation

Related Articles

Related Whitepapers

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Driving Energy Savings a Commercial Facility Energy Upgrade Project

Upgrading to Design Envelope pumps helped GAC save energy costs of 20,000 AED in the first year. Armstrong’s Pump Manager service provides reports and notifications…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *