Durlon Provides A High Performance Sealing Solution To A Chilean Open-pit Mine

Durlon

Durlon Provides A High Performance Sealing Solution To A Chilean Open-pit Mine

End-User Description

A Chilean open-pit mine that produces 75,000 tonnes of copper per year. It is part of a large natural resource company producing over 90 commodities worldwide and remains committed to the health and safety of its’ employees as well as environmental protection.

The Challenge

With commodity production, process engineers typically seek low cost/highly productive solutions. In this case, the end user uses heap leaching to separate copper from other biproducts. While heap leaching is an effective solution, mineral recovery is only about 60-70%, and highly aggressive chemicals are used and produced which can cause incompatible gasket material to break down and fail. Joint leaks in this scenario can pose a massive safety risk to workers, environmental concerns, and possibly a loss of revenue in the event of liabilities, time loss and lost product. Finding suitable materials for service in sensitive environments such as these, can be both time consuming and costly.

The Solution

We began working closely with the mine engineers at providing a cost effective and high-performance sealing solution to help conduct refine from the leaching process. Durlon® 9000 was spec’d for its ability to withstand the leaching conditions and the material is compatible with both sulphuric acid and the refine.

The Benefits

The end-user discovered Durlon® PTFE through published data proving the material’s high sealability and were pleased to find that replacing their old ring gaskets with Durlon® products reduced previous joint leakage, helping to avoid fluid contamination and recover more mineral.

Check out the Durlon® 9000

Durlon 9000

Related Articles

Related Whitepapers

Arrow Powers Gas Turbine Analysis at Fern Engineering

Fern Engineering, Inc. was contracted by a major refinery to reduce the exhaust gas temperature variations of their gas turbine fleet. According to Hector Bourgeois,…

2027 DOE Efficiency Mandate & The Case for Higher Efficient Motors

The 2027 DOE motor efficiency requirements are bringing important changes to industrial motor applications. In this presentation, ABB’s Courtney Pickett and Stefanie Casimir break down…

ENKA Designs a State-of-the-Art District Heating System for Hamburg’s CHP Plant

Datacor Fathom provided the best solutions in terms of both heat transfer and pressure loss calculations.” – Kerem Algüzey, ENKA Industry: Power Generation Region: Hamburg,…

Refinery Cooling Water System Calibration Using Datacor Fathom

Hydrus Works, LLC needed to recalibrate a large refinery cooling water system containing nearly 600 pipes, 492 junctions, and 127 heat exchangers. Over 700 pressure,…