Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

DOE announces largest single investment in hydropower facilities, at $71.5 million

Industry News
DOE announces largest single investment in hydropower facilities, at $71.5 million

DOE announces largest single investment in hydropower facilities, at $71.5 million

The U.S. Department of Energy (DOE) announced its largest single investment in hydropower with the selection of 46 projects to receive up to $71.5 million in incentive payments to increase generation efficiency of the existing fleet.

The Hydroelectric Efficiency Improvement Incentive payments are administered by the Grid Deployment Office and funded by the Bipartisan Infrastructure Law.

“Hydropower is the nation’s prototype of renewable power playing an important role in deploying affordable and reliable electricity across the country,” said U.S. Secretary of Energy Jennifer M. Granholm. “Thanks to the President’s Investing in America agenda we are maintaining and expanding our hydropower fleets, helping reduce costs of operation and ensuring American workers continue to drive the nation’s clean energy transition.”

This incentive program received robust industry interest, DOE said, with applications requesting a total of $192 million in federal support. Using all available funding directed to the incentive, the selected improvements are anticipated to generate $468 million in combined federal and private investment. With an average selectee facility age of 75 years, these upgrades will contribute to the continued operation and longevity of hydroelectric assets.

Hydropower accounts for 27% of renewable electricity generation in the U.S., as well as 93% of all utility-scale energy storage capacity. In addition, the U.S. hydroelectric fleet and their associated reservoirs play an important role with respect to water supply, flood control and recreation. More efficient use of water for electric generation can only enhance the fleets’ ability to more effectively manage the nation’s waters.

Investments under the Hydroelectric Efficiency Improvement Incentives will support the continued operation of the U.S. hydropower fleet and ensure a more reliable and resilient electric grid system. The owners or operators of hydroelectric facilities, including pumped storage hydropower, receiving the efficiency incentives announced will make capital improvements that improve their facility’s efficiency by an average of 14% with a statutory minimum of 3% improvement per facility. Investments include upgrades to facility turbines and generators, as well as improvements to water conveyance structures, to increase efficiency.

The 46 selected projects are in California, Colorado, Connecticut, Georgia, Idaho, Maine, Massachusetts, New Hampshire, New York, North Carolina, Oklahoma, Oregon, Pennsylvania, Rhode Island, Tennessee, Vermont, Virginia, Washington and West Virginia.

The Hydroelectric Efficiency Improvement Incentives are one of three incentive offerings funded by the Bipartisan Infrastructure Law to maintain and enhance existing hydroelectric facilities and ensure generators continue to provide clean, renewable electricity, while improving dam safety and reducing environmental impacts. Other program offerings include Hydroelectric Production Incentives provided to qualified hydroelectric facilities for electricity generated and sold and Maintaining and Enhancing Hydroelectricity Incentives provided to existing hydroelectric facilities for capital improvements directly related to grid resiliency, dam safety and environmental improvements.

Originally published on Power Engineering: https://www.power-eng.com/renewables/hydroelectric/doe-announces-largest-single-investment-in-hydropower-facilities-at-71-5-million/

Read about protecting Hydropower Facilities with A.W. Chesterton Coating Solutions.

Related Articles

Related Whitepapers

CFturbo BLADERUNNER Centrifugal End-Suction Pump Casestudy

The CFturbo BLADERUNNER 2024 is a unique and innovative tool that will outperform the known capabilities of an automated simulation process for Turbomachinery performance maps.…

Defeat The Enemies That Interrupt Your Water/Wastewater Operation

Download ABB’s new playbook to help you identify and defeat the enemies that interrupt your water/wastewater operation and learn how you can… • Reduce operational…

Sodium Hypochlorite Service Success with NETZSCH PERIPRO®

Sodium hypochlorite (NaOCl) is widely used by municipal water treatment plants Sodium hypochlorite (NaOCl) is an effective water disinfectant to treat the raw, filtered water…

Tips for the Installation of MCRT® Torquemeters

An MCRT® torquemeter must be installed properly as an integral part of a drive line network in order to achieve satisfactory operation. Proper installation will:…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *