Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Crane Pumps & Systems Launches Quick Ship Program

Crane Pumps & Systems
Quick Ship

Crane Pumps & Systems Launches Quick Ship Program

Emergency problems do happen, such as a pump down or a flood which results in difficult expediting. CP&S knows how important product availability is to winning in the marketplace. The launch of the new quick ship program guarantees a 2 day lead time from time of order.

This program includes a wide variety of products reaching across all markets. The products that were chosen to participate were picked based on which products were asked to be expedited or rushed most frequently. The SKU’s included in the program will be re-evaluated each quarter for the necessity of additions.

In order to make this program succeed CP&S dedicated space in their Piqua, OH manufacturing plant to stock inventory of the quick ship products. This competitive quick ship program is aimed to help channel partners in emergency situations where unplanned and immediate shipments are necessary. See your local CP&S distributor for more details.

Learn about our product portfolio and services at www.cranepumps.com.

Crane Pumps & Systems is in Piqua, Ohio, USA.

About Crane

Crane Co. is a diversified global manufacturer of engineered industrial products traded on the New York Stock Exchange (NYSE: CR). One of its segments, Crane Fluid Handling, provides highly engineered products for fluid handling applications worldwide.

Crane Pumps & Systems designs and manufactures pumps, accessories and systems to provide solutions for municipal water and wastewater, residential building, commercial building, industrial and military pump market segments. Our trusted brands include Barnes®, Burks®, Crown®, Deming®, Prosser® and Weinman®.

www.cranepumps.com

Related Articles

Crane variable speed frequency drives Quick Start Guide

VFD Quick Start Guide

Using variable speed/frequency drives on wastewater pumps can be tricky, but if the drives are sized and programmed properly, they…

Related Whitepapers

Climate Control and Extra Cargo Space: a Commercial Facility Case Study

The Armstrong Design Assist service reduced the required floor space for hvac equipment. The ipc 11550, delivered as part of a packaged system, automates the…

Upside Down Condos [Case Study]

This condo tower (324 units on 13 floors) had completed a previous retrofit that unfortunately left the variable speed pumps operating in a fixed mode…

Ras Al Khaimah saves 20% energy and 12% OPEX in wastewater pumping system

RAKWA is the RAK wastewater agency responsible for designing, building, operating, and maintaining all the public wastewater systems. Ras Al Khaimah—known as RAK—is the northernmost…

Intelligent Pumps Exceed Savings Estimates (Commercial Facility Installation Casestudy)

Design Envelope 6800 boosters reduced energy consumption by 76% compared to previous boosters, resulting in annual cost savings of $4,400 per system. Background The Heron’s…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *