Lift station at the waste water treatment plant in Hamilton, AL has an unique application. Sewage from across the city is pumped on to incline screens in the treatment plant. Water from the screenings along with rainwater and debris is collected in a sump. This water is again pumped back to the screens in a closed loop.

The station evidently has high solid content. City had to de-rag the non-clog pumps every month. These pumps were unable to handle solids like mop heads, rags, greasy hairballs, plastics and debris.

Ron Hylton, treatment plant’s supervisor, approached Pump & Process Equipment (PPE) for a permanent and cost-effective solution for his clogging problems. PPE and Crane Pumps and Systems worked together and provided a Barnes® Sithe 4SCMD 7.5 HP chopper pump in June 2017.

It’s been 8 months since Sithe’s installation and it hasn’t clogged even once. The first time it was pulled was for a 6-month regular checkup. Sithe’s stainless steel heat treated blades were found in pristine condition and had retained sharpness. It continues to operate as the lead pump in the station obliterating even the biggest and toughest of solids.

Related Articles

Crane variable speed frequency drives Quick Start Guide

VFD Quick Start Guide

Using variable speed/frequency drives on wastewater pumps can be tricky, but if the drives are sized and programmed properly, they…

Related Whitepapers

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Driving Energy Savings a Commercial Facility Energy Upgrade Project

Upgrading to Design Envelope pumps helped GAC save energy costs of 20,000 AED in the first year. Armstrong’s Pump Manager service provides reports and notifications…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *