Correcting Base Bound and Bolt Bound Conditions in the Shaft Alignment Process-Part 3

Industry Topics

Correcting Base Bound and Bolt Bound Conditions in the Shaft Alignment Process-Part 3

Identifying and Correcting BBBB Conditions on Installed Machinery

BBBB conditions normally occur on machines that have been installed for some time, and for a variety of reasons:

  • No alignment, or improper alignment, before the machine was installed.
  • Process or equipment changes, which mean that original machine components, such as motors and pumps, have been switched over to different models, larger horsepower demands, piping changes, etc.  These changes are sometimes done on existing baseplates or skids, without considering that the heights of the new components may be different.
  • Thermal changes in piping, which can cause unwanted piping movement.
  • Foundation or grout settling, or machinery base degradation.
  • Improper use of pipe hangers, saddles, conduit, flexible flanges, or other external devices mounted to the system.

Regardless of the cause, shaft alignment may never be satisfactory until the problem is remedied.

There are a several methods to correct a BBBB condition. Some are quite simple and easy to employ. Others may require extensive reworking of the machine base. If such a condition is measured, make the following observations:

Base Bound

  • Can the movable machine be lowered?
  • Can the stationary machine be raised?
  • Will piping or duct flanges allow vertical movement of the stationary machine?
  • Will vertical movement of the stationary machine induce pipe strain?
  • Can the inboard end of the stationary machine be raised, without affecting the outboard end of the machine?
Bolt Bound

  • Is the movable machine bolt bound? Loosen each hold down bolt, and see if it will turn freely.
  • Can the stationary machine be shifted in the opposite direction of the movable machine’s “bind”?
  • Could smaller, hardened bolts be used?
  • Can the inboard end of the stationary machine be moved toward the movable machine?

 

These methods can be employed to correct a BBBB condition with a minimum of work.

Correcting Graphically

If the condition is slight to moderate, AND if a slight movement of the stationary machine is possible (without inducing pipe or duct strain), it is possible to graph the misalignment, determine alternative moves, and correct the misalignment.

In this example, vertical misalignment is:

 

  • A vertical offset of +10 mils.
  • A vertical angularity of +1.4 mils per inch.
Example of vertical misalignment

 

The vertical misalignment may be solved using the following steps:

chart of misalignment correction steps

 

 

 

 

 

 

 

  • A straight line, representing the vertical centerline of the stationary shaft (a side view), is drawn (shown in black).
  • Positions of the movable and stationary machines are labeled and graphed as follows:
    • RFM=Rear Foot Moveable
    • FFM=Front Foot Moveable
    • COC=Center of Coupling. Think of this as the “pivot point” between the machines
    • FFS= Front Foot Stationary
    • RFS= Rear Foot Stationary
    • The misalignment correction amounts for the movable feet are plotted.
    • A line (shown in red) is drawn connecting the correction amounts at the feet, and it projected to the stationary machine.
    • A line is drawn connecting the Rear Foot Movable and the Rear Foot Stationary (shown in green).
    • By using the vertical scale of 10 mils per block, we can calculate the moves needed to correct.
      • Shim the Front Foot Stationary up 10 mils.
      • Shim the Front Foot Moveable up 5 mils.

Correcting Mathematically

In the same example, the Rear Foot Moveable is +38.9 mils, the Front Foot Moveable is +23.8 mils, and the distance between them is 11 inches.  From this, we can calculate the slope:

 

38.9-23.8 / 11 = 1.37 mils/inch

 

This is the slope the moveable machine has.  However, the slope we want is the slope from the Rear Foot Moveable to the Rear Foot Stationary, using the Rear Foot Stationary as a zero point.

 

38.9 mils/42 inches = 0.92 mils/inch

 

So, measuring from the zero point (Rear Foot Stationary) to the Front Foot Stationary:

 

 
Chart of measuring slopeChart measuring from zero point

 

10 inches x .92 mils/inch = 9.2 mils of shim added to this foot.

Measuring from the zero point (Rear Foot Stationary) to the Front Foot Moveable:

31 inches x .92 mils/inch = 28.52 mils (minus the 23.8 mils it already has) = 4.72 mils added to this foot.

These results are close to the results plotting in the graphical method, but since they are done mathematically, they are calculated to a degree of accuracy that is difficult to do graphically.  The only errors would be in the degree of measuring, the amount of “rounding off” the numbers, and the accuracy of performing the calculations.

 

 

 

Correcting With the Laser Alignment Tool

The Feet Lock™ function in the Fixturlaser XA systems allows the user to easily identify the moves necessary on the stationary and movable machines. Several solutions can be examined very quickly to determine which move is most appropriate.  Other alignment tools offer similar methods.

 

The benefits of using an XA System to correct this condition are:

  • The XA System does all of the math and graphing for you, virtually eliminating errors.
  • The XA System will be much more accurate.
Image of connecting laser alignment tool
  • Using Live Mode, you can see the correction values in real time, and make any further corrections necessary to achieve an accurate alignment.
  • The user can choose which combination of “feet” to move, even alternating between machines.

Correcting By Modification

If none of these options will move the machines sufficiently to correct BBBB, there are other alternatives.  They require more work, usually are more expensive, and often must be approved by engineering.

  • Use undercut bolts, or smaller bolts.
  • Slot the base.
  • Oversize the holes in the motor feet.
  • Plug the existing holes in the base, and re-drill and tap new ones in the proper location.
  • Use a portable milling machine to remove material from the baseplate.  Grinding by hand is not recommended, since it is difficult to grind the surface flat enough.

These should be your last options, because they usually require much more work and downtime.

Summary

The best time to correct a Base Bound or Bolt Bound condition is when the machine is new, and before it is installed.  The next best time is during the installation process, before any additional components, such as piping or conduit, as mounted.

If Base Bound or Bolt Bound conditions are encountered on existing equipment, there may be options to expensive re-machining and re-work.

Lastly, there are options to solving for Base Bound or Bolt Bound conditions.  And the more accurately and easily they can be performed, the more accurate the alignment results will be.

Related Articles

Related Whitepapers

Performance Prediction: A Unique Approach for the Aftermarket

Hydro’s software has allowed CFTurbo to improve the optimize the performance of equipment and its fit to its system to make dramatic efficiency and reliability…

Corrective vs. Preventive Maintenance: Which is Better?

Corrective Maintenance This is performed only after a failure occurs in the equipment, which can lead to unexpected downtime and costly repairs. Although it is…

Torque Sensors For Any Application

This guide from S. Himmelstein & Company details their torque sensor solutions, designed to meet the demands of any industry. Learn about: Ultra-Precise Spline Drive…

What is Water Hammer and Why It Is Important to Prevent?

Water hammer (or hydraulic shock) is the momentary increase in pressure inside a pipe caused by a sudden change of direction or velocity of the…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *