Challenge

Issue
A two-stage vertical turbine booster pump seal failed within 2-3 days. The seal was changed out, and again it failed within the same 2 – 3 day time period. Clearly there was a problem, but no one knew why, and it was impossible to ‘see inside’ the seal to determine the root cause of the problem.

A.W. Chesterton Pump Process Issues Identified and Solved with Chesterton Connect™

Solution

Overview

  • AW Chesterton Connect™ sensor was installed to monitor the process conditions causing premature seal failure. With the Chesterton Connect app, the user was able to chart the process pressure (decreasing) and temperature (increasing) while the pump was operating.
  • Because of the Chesterton Connect data, critical operating changes were identified and the seal failure problem was fixed.

A.W. Chesterton Pump Process Issues Identified and Solved with Chesterton Connect™

Results

Client Reported
A.W. Chesterton Pump Process Issues Identified and Solved with Chesterton Connect™Reliability was achieved and the plant saved thousands with a very small investment.

  • Averted downtime and lost production
  • Avoided fixing the same problem over and over
  • Reduced stocking need of spare seals
  • Continuous monitoring helps identify changes over time and ward off future problems

 

Related Articles

Related Whitepapers

Arrow Powers Gas Turbine Analysis at Fern Engineering

Fern Engineering, Inc. was contracted by a major refinery to reduce the exhaust gas temperature variations of their gas turbine fleet. According to Hector Bourgeois,…

2027 DOE Efficiency Mandate & The Case for Higher Efficient Motors

The 2027 DOE motor efficiency requirements are bringing important changes to industrial motor applications. In this presentation, ABB’s Courtney Pickett and Stefanie Casimir break down…

ENKA Designs a State-of-the-Art District Heating System for Hamburg’s CHP Plant

Datacor Fathom provided the best solutions in terms of both heat transfer and pressure loss calculations.” – Kerem Algüzey, ENKA Industry: Power Generation Region: Hamburg,…

Refinery Cooling Water System Calibration Using Datacor Fathom

Hydrus Works, LLC needed to recalibrate a large refinery cooling water system containing nearly 600 pipes, 492 junctions, and 127 heat exchangers. Over 700 pressure,…