Leakage Control for Condenser Block Valve

A.W. Chesterton
Chesterton Leakage Control for Condenser Block Valve

Leakage Control for Condenser Block Valve

Challenge

Goal
Provide effective sealing for a critical valve (Condenser Block Valve), which was leaking in the containment area.

  • This is a radiated space that is highly critical for plant operation and can cause plant shut downs costing millions of dollars per day
  • This is also the “hot” side of the plant where personnel must restrict their time exposure to radiation
Chesterton Leakage Control for Condenser Block Valve

Chesterton 5300 GTPI and 5100 Carbon Bushing.

Solution

Product
Working with the plant engineers, Chesterton supplied its Valve Sealing System (VSS) to solve this problem quickly:

  • Measured and installed the VSS in 18 hours
  • The packing set consisted of 4 rings of Chesterton 5300 GTPI, a die-formed inhibited graphite packing, and 2 end rings of Style ONE™
  • The Chesterton 5100 carbon bushing was cut to length during installation
Chesterton Leakage Control for Condenser Block Valve

Journeyman’s worksheet from Chesterton Valve Management Software Tools.

Results

Time & Cost Efficiencies; Renewed Safety

  • Customer was able to install and return to service on-time — saving thousands in productivity!
  • Chesterton packing system is leak-free. In the containment area, the valve will not be operated for 18 months unless an issue arises. (These valves only function when there is an issue)
  • Employee safety was maintained

Related Articles

Related Whitepapers

How to Read a Pump Curve (and Why you Want to)

If you have ever worked with pumps before, be it in an installation, maintenance, or engineering capacity, chances are high you have seen a pump…

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *