Modern Energy Saving a Commercial Hotel Energy Upgrade

armstrong modern energy saving a commercial hotel energy upgrade

Modern Energy Saving a Commercial Hotel Energy Upgrade

Improved efficiency, temperature control and reliability created a luxurious environment at the Park Hyatt Doha. Combining Design Envelope technology with Parallel Sensorless Pump Control and Active Performance Management, reduced annual costs for pumping energy by over $31,000.

Background

The Park Hyatt Doha is a luxury hotel located in Msheireb Downtown – the world’s first fully developed smart and sustainable city district. Seeking to improve the energy efficiency and performance of the hotel’s cooling systems, management enlisted the help of Armstrong to design and deliver a retrofit solution. Armstrong recommended Design Envelope Vertical In-Line pumps, with intelligent variable speed technology supported by Patented Parallel Sensorless Pump Control and subscription to the Pump Manager service.

Because temperatures fluctuate throughout the year, 100% system output is required for only a small percentage of total operating hours. For the majority of the year, HVAC systems operate at part load. In most applications, operating two or more smaller pumps is more efficient than one larger pump.

Soon after the commissioning was completed, managers at the Park Hyatt Doha expressed concerns over the staging patterns of the PSPC technology, noting that only one pump was operating during the night-time hours. After reviewing the system data through Pump Manager, Armstrong confirmed that the pumps were all in good working condition, without any warnings or alarms. The reduced pump output reflected the lower demand for cooling.

A key aspect of ensuring long-term system efficiency and occupant comfort is Active Performance Management. At the Park Hyatt Doha, Pump Manager prevented a cooling system incident, using the Wi-Fi capabilities of Design Envelope pumps to send a real-time alert when a drop in performance was detected. A local technician had mistakenly closed a valve within the cooling system, cutting off the flow of coolant. Had Armstrong Fluid Technology® established 1934 the software not alerted the maintenance team, the dead-head status could have led to seal failure, motor failure, or failure of other system components.

Through the integration of variable speed technology, Parallel Sensorless Pump Control, and active performance management, Park Hyatt Doha reduced annual costs for pumping energy by over $31,000. In addition, the hotel has been able to maintain its promise of providing the ultimate luxury experience.

Related Articles

Armstrong Celebrates 90th Anniversary

Armstrong Celebrates 90th Anniversary

Armstrong Fluid Technology marked its 90th anniversary this April, celebrating a significant milestone of longevity and innovation in the fluid-flow…

Related Whitepapers

How to Read a Pump Curve (and Why you Want to)

If you have ever worked with pumps before, be it in an installation, maintenance, or engineering capacity, chances are high you have seen a pump…

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *