Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Modern Energy Saving a Commercial Hotel Energy Upgrade

armstrong modern energy saving a commercial hotel energy upgrade

Modern Energy Saving a Commercial Hotel Energy Upgrade

Improved efficiency, temperature control and reliability created a luxurious environment at the Park Hyatt Doha. Combining Design Envelope technology with Parallel Sensorless Pump Control and Active Performance Management, reduced annual costs for pumping energy by over $31,000.

Background

The Park Hyatt Doha is a luxury hotel located in Msheireb Downtown – the world’s first fully developed smart and sustainable city district. Seeking to improve the energy efficiency and performance of the hotel’s cooling systems, management enlisted the help of Armstrong to design and deliver a retrofit solution. Armstrong recommended Design Envelope Vertical In-Line pumps, with intelligent variable speed technology supported by Patented Parallel Sensorless Pump Control and subscription to the Pump Manager service.

Because temperatures fluctuate throughout the year, 100% system output is required for only a small percentage of total operating hours. For the majority of the year, HVAC systems operate at part load. In most applications, operating two or more smaller pumps is more efficient than one larger pump.

Soon after the commissioning was completed, managers at the Park Hyatt Doha expressed concerns over the staging patterns of the PSPC technology, noting that only one pump was operating during the night-time hours. After reviewing the system data through Pump Manager, Armstrong confirmed that the pumps were all in good working condition, without any warnings or alarms. The reduced pump output reflected the lower demand for cooling.

A key aspect of ensuring long-term system efficiency and occupant comfort is Active Performance Management. At the Park Hyatt Doha, Pump Manager prevented a cooling system incident, using the Wi-Fi capabilities of Design Envelope pumps to send a real-time alert when a drop in performance was detected. A local technician had mistakenly closed a valve within the cooling system, cutting off the flow of coolant. Had Armstrong Fluid Technology® established 1934 the software not alerted the maintenance team, the dead-head status could have led to seal failure, motor failure, or failure of other system components.

Through the integration of variable speed technology, Parallel Sensorless Pump Control, and active performance management, Park Hyatt Doha reduced annual costs for pumping energy by over $31,000. In addition, the hotel has been able to maintain its promise of providing the ultimate luxury experience.

Related Articles

Related Whitepapers

Performance Prediction: A Unique Approach for the Aftermarket

Hydro’s software has allowed CFTurbo to improve the optimize the performance of equipment and its fit to its system to make dramatic efficiency and reliability…

Corrective vs. Preventive Maintenance: Which is Better?

Corrective Maintenance This is performed only after a failure occurs in the equipment, which can lead to unexpected downtime and costly repairs. Although it is…

Torque Sensors For Any Application

This guide from S. Himmelstein & Company details their torque sensor solutions, designed to meet the demands of any industry. Learn about: Ultra-Precise Spline Drive…

What is Water Hammer and Why It Is Important to Prevent?

Water hammer (or hydraulic shock) is the momentary increase in pressure inside a pipe caused by a sudden change of direction or velocity of the…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *