Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
White Papers

8X Longer Packing Life in Slurry for Fertilizer Manufacturing

Challenge

Issue

Existing packing lasted only three days due to abrasive gypsum slurry in the fertilizer mineral manufacturing process. Shaft required replacement every few days.

Root Cause

Existing packing failed due to a loss of compression, allowing the gypsum mineral to enter the stuffing box, fret the shaft, damage the packing, and cause uncontrollable leakage.

Goal

Achieve 15 days of continuous service to support plant cycle.

AW Chesterton 8X Longer Packing Life in Slurry for Fertilizer Manufacturing

Please fill out the following form to access this premium content

Privacy Policy:
Empowering Pumps & Equipment is committed to protecting and respecting your privacy, and we’ll only use your personal information to administer your account and to provide the products and services you requested from us and/or our partner. We may also send you our eNewsletter, of which you can unsubscribe and/or customize in your email preferences. By providing your information including email and clicking the button below, I agree to the Terms and Conditions and Privacy Policy, provide my electronic signature, and consent to receive the product/service requested. Consent is not a condition of any purchase. You may opt out any time.

*