The Echowater Project is upgrading the existing Sacramento Regional Wastewater Treatment Plant located in Elk Grove, California. The facility is being renovated in order to meet the new treatment requirements set by the Central Valley Regional Water Quality Control Board (CVRWQCB) and State Water Resources Control Board (SWRCB).

The project

Regional San was issued stringent new treatment requirements in 2010 from the State of California to make significant upgrades to the wastewater treatment plant. The new system, with a targeted completion date in 2023, will produce cleaner water for discharge to the Sacramento River, as well as the potential reuse of recycled water (e.g. for landscape and agricultural irrigation).

KSB Regional San EchoWater Project (2)

This major upgrade has been given the name of “EchoWater Project” to reflect how it will utilize and process the wastewater, returning it to a clean, natural state – in the same manner that an “echo” returns to its source of origination. Once completed, Regional San will be in compliance with its regulatory permits and improve water quality by resulting in a 99 percent reduction in ammonia discharged to the Sacramento-San Joaquin River Delta. Ultimately, EchoWater will be capable of meeting the region’s needs and protecting the waterways for generations to come.

KSB Regional San EchoWater Project (3)

The EchoWater Project, which is one of the largest public works projects in Sacramento’s history, comprises structures from several other projects, including Biological Nutrient Removal (BNR) tanks, granular media filters, disinfection basins, pumping stations, electrical buildings, and support facilities. The BNR process will eliminate nearly all ammonia and most nitrate, while filtration processes will help remove smaller particles and pathogens from the effluent. Enhanced disinfection will also be implemented to inactive pathogens.

KSB Regional San EchoWater Project (4)

Key Success Factors

Meeting rigorous reliability and energy efficiency requirements, KSB pumps and mixers serve the heart of the plant. The KSB equipment, supplied in three different project phases, will play a critical role in achieving the stringent requirements issued by the State of California. Additionally, the experience and expertise of KSB and KSB manufacturer representative, G3 Engineering, greatly contributed in the selection process for this complex and highly demanding project.

KSB Equipment Applications Qty.
KRT Pumps Nitrifying Sidestream
Waste Activated Sludge, Stormwater, Mixed Liquor
20
Biological Nutrient Removal
Wet Well Drainage, Primary Effluent Jetting, Bay Drainage, Gravity Diversion Drainage, CFE Drainage, Ox6 Scum Pumps, PE Splitting Scum Pumps, Deoxygenation Scum Pumps, RAS Pre-Anoxic Scum Pumps, Stormwater, Mixed Liquor Flow Splitting Scum Pumps
27
Amaprop Mixers Mixed Liquor Fermenter and Anaerobic Mixing,
Deoxygenation Mixing, RAS/Pre-Anoxic Channel Mixing
54
Sewatec Pumps Waste Activated Sludge, Mixed Liquor Fermenter, Drainage 14
Amacan P Pumps Mixed Liquor Recycle 16

KSB Regional Project products

Related Articles

Related Whitepapers

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Driving Energy Savings a Commercial Facility Energy Upgrade Project

Upgrading to Design Envelope pumps helped GAC save energy costs of 20,000 AED in the first year. Armstrong’s Pump Manager service provides reports and notifications…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *