Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Refinery pumps ease traffic in Oman

KSB
KSB pipeline

Refinery pumps ease traffic in Oman

By: KSB

The KSB Group has supplied 39 pumps manufactured to API 610 standard to the Sultanate of Oman. The pump sets operate in a so-called two-way pipeline which was put into service at the end of October 2017 and can be used for various petrochemical products. The pipeline is the first of its kind to be constructed in Oman. It connects the Mina Al Fahal and Suhar refineries located on the Gulf of Oman through a 280 km pipeline to an intermediate distribution and storage facility at Jifnain as well as a new storage facility at Muscat International Airport.

The pumps are operated in injection and gas oil return as well as in pipeline and collecting tank drainage service. The process pumps are of API types OH2, VS1 and VS4. They have cast steel casings and their shafts are made of forged alloy steel. 55 kW
2-pole and 4-pole three-phase motors are mainly used as drives.

The new pipeline network eliminates the need for transporting the refinery products by ship and truck. This reduces the traffic load in and around Muscat and benefits the environment.

Related Articles

Related Whitepapers

How to Read a Pump Curve (and Why you Want to)

If you have ever worked with pumps before, be it in an installation, maintenance, or engineering capacity, chances are high you have seen a pump…

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *