Sithe Chopper Pump Solution For Heber Springs, AR

Crane Pumps & Systems
Crane Chopper Pump Solution for clogging in Heber Springs

Sithe Chopper Pump Solution For Heber Springs, AR

Application Overview Of Chopper Pump 

Heber Springs, Arkansas is home to approximately 7500 people and 29 lift stations. The area is a popular vacation spot, which means the population can spike in the summer. Greers Ferry Lake and the Little Red River’s excellent boating and fishing bring people from all around.

Pump Station Details

The Southridge Village lift station is the closest to the wastewater treatment plant, and is particularly troublesome. The inflow comes from residences, an assisted living facility, hospital and multiple restaurants, resulting in a wide array of challenging solids. The station sees stringy solids, like disposable wipes and mop heads, mixed with oils and grease. The station was constructed in 2000, and has seen a myriad of different pumps over it’s life. Prior to the more recent issues, the pumps were replaced about every 3 years. However, in the past two years, the station went through four different pumps due to clogging issues. The city tried grinders, non-clog and vortex pumps, and every pump would clog about 2-3 times per week. Each clog event would require a two man team around 8 hours to manually pull the pump and unclog by hand, which could cost approximately $600 a week.

Installation

Heber Springs Water and Wastewater Utility approached JR Stewart Pump & Equipment Inc, the local Barnes representative, for a new solution to their clogging issues. In May of 2018, Heber Springs purchased and installed a Barnes 4” 5HP Sithe Chopper Pump to replace one of the pumps in the duplex lift station. The installation was easy, since the Sithe chopper was able to utilize the existing rail system. Since installation, the pump has not experienced a single clog or issue, and its sister pump has not either. Because of the success of this station, the City has already ordered another Sithe chopper for a troublesome lift station with a large department store. This new station has seen a recent influx of face masks and latex gloves due to the COVID-19 Pandemic. Paul Graham, the General Manager of the Heber Springs Water and Wastewater Utility noted that he would eventually like to convert all lift stations to the Sithe Chopper, because it gives them peace of mind.

Key Takeaways

Pain Points

• The existing pumps clogged multiple times a week, causing headaches for the Wastewater Utility.
• Each clogging event was typically accompanied with overheating motors, which caused tripped breakers and further maintenance.

Benefits

  • Heber Springs installed a 5HP Sithe Chopper, and has not had to service the lift station since.

To learn more on the Sithe Chopper Pump click HERE or HERE.

Related Articles

Crane variable speed frequency drives Quick Start Guide

VFD Quick Start Guide

Using variable speed/frequency drives on wastewater pumps can be tricky, but if the drives are sized and programmed properly, they…

Related Whitepapers

Efficient Waste Handling Solution

Nature’s Way Foods needed a more reliable and hygienic way to remove fruit processing waste from high-care production areas. Frequent pump downtime and difficult-to-handle materials…

As Easy As ABC – Accurate Batch Control

Highly concentrated bakery ingredients demand precise, repeatable dosing to protect product quality and control costs. This case study highlights how A.B. Mauri achieved fast, accurate…

Pump Maintenance Mistakes Checklist

A pump is an expensive piece of any water system. Maybe not the most expensive, but certainly not the least. However, only a small fraction…

Selecting the Right Bearings to Improve Vertical Turbine Pump Reliability

Selecting the Right Bearings to Improve Vertical Turbine Pump Reliability Vertical Turbine Pumps (VTPs) are available in a variety of configurations and are used for…