Surprise Change In The Distance Between Shaft Ends

Coupling Corp Surprise BSE Change

Surprise Change In The Distance Between Shaft Ends

Thermal Growth – No Problem

Recently a power plant was installing a new coupling after an extended outage. A new pump shaft and element were installed during the outage, and significant work was performed on the turbine. The original distance between shaft ends (DBSE or BSE) was 14.0 inches, and the FLEXXOR Coupling spacer was designed for this dimension. However, the correct amount of thermal growth and equipment thrust was unknown at that time.

Thermal Growth Determination

Before the installation could continue, a discussion about thermal growth and thrust position ensued. The team realized that the net result of the shaft movement would amount to a different BSE than was expected. The difference in shaft position was about 0.100 inches. Since the allowable axial movement of the coupling was +/- 0.090 inches, it was crucial to set the hubs and shafts properly so that the running BSE would not be in a position to overly stretch or compress the coupling.

Coupling Corp Surprise BSE Change (1)Correcting the Axial Position of the Coupling Hub

Once the correct shaft spacing was determined, the hubs needed repositioning. Since the pump side hub was already fixed in its position by the shaft taper, the adjustment needed to happen on the turbine side where the shaft was straight. Luckily CouplingCorp had designed the hubs to have some adjustability in the axial position of up to 0.250 inches. So, within minutes, the Anderson Clamp Hub was loosened, repositioned, and re-tightened in the new position.

Thanks to the ease of use of the Anderson Clamp Hub, the mechanics overcame a last-minute hurdle with no sweat. No heat or hydraulics were needed, and one mechanic could make the adjustment very quickly.

Related Articles

Coupling Corp Circulating Water Pump Success (1)

Circulating Water Pump Success

Large Vertical Pumps with Large Problems A power plant had problems with its circulating water pump system. The system was rated…

Related Whitepapers

Torque Measurement Precision: Why the Overload vs. Overrange Distinction Matters for Quality Control

Why properly understanding and differentiating between overload and overrange helps to maintain the accuracy and longevity of the torque meter. Two easily overlooked, yet extremely…

Implementing Predictive and Prescriptive Digital Maintenance Technologies for Rotating Equipment

Business and operations systems are becoming increasingly integrated in the digital era. With accessible data and information, enhancing the business value of plants that utilize…

Building a Centrifugal Pump Digital Twin for a Chemical Plant

A digital twin represents a physical asset and its function; it contains intelligence to evaluate static and real-time data. Chemical refining plants are asset intensive…

Autonomous Fontan pump: Computational feasibility study

A double-inlet, double-outlet rotary pump was designed to augment Fontan flow through the total cavopulmonary connection. Pump power is supplied by a systemic arterial shunt…