Developing an Equipment Preservation Plan for Plant Inventory

A.W. Chesterton
AWChesterton Learn how to plan and execute an inventory protection

Developing an Equipment Preservation Plan for Plant Inventory

When dealing with inventory, a solid equipment preservation plan can potentially save your facility thousands, if not millions, of dollars per year by extending the asset life of new equipment and parts. It will also ensure better reliability within the plant when those valuable assets are put into play.

The Hidden Costs of Decaying Inventory

Due to extremely long lead times and remote locations, many plants in aggressive industries (such as oil and gas) purchase parts and equipment far ahead of when needed and maintain a fairly large inventory.

A.W. Chesterton Decaying Inventory and How to Remedy It

This strategy prevents potential emergency shutdown situations that can be very costly. But unless managed properly, an unprotected inventory of parts and equipment can have dramatic cost implications that often go unrecognized.

Inventory Degradation

The storage conditions for inventory are not always ideal. Some industrial parts are even stored outdoors. Extreme temperatures, humidity, oxygen, and corrosive environments can be extremely detrimental to the integrity of most metal and non-metal parts. Metals corrode over time, and polymer and plastic materials start to harden.

A.W. Chesterton Corrosion can quickly degrade unprotected inventory.

Corrosion can quickly degrade unprotected inventory.

This degradation can create quite a challenge for facilities that expect inventory parts to be ready for service when needed. Instead, the quality of the “new” part is now questionable. Will the rust on a part that is going into critical equipment affect the reliability of the entire operation? What is the structural integrity of a corroded valve? Will the hardened rubber belt still function properly? These are uncertainties that no operator or manager wants to deal with. Putting compromised parts in place often means equipment is doomed to fail much sooner than expected.

Instead Chesterton recommends creating and investing in a comprehensive equipment preservation plan.

Preventative Inventory Maintenance

For inventory that is brand new or still in relatively good condition, you’ll want to map out a protection and preservation plan for each equipment or part type.

A.W. Chesterton Inventory Preservation Programs

Left: Compromised valve components without proper protection. Right: Components after restoration and preservation.

Due to the wide range of material types, the solutions for preservation will vary.  Some solutions might be very specific, depending on the complexity of the material type. For example, heat exchangers, pumps, piping, and valves — with large macro surfaces to protect — would be treated differently than precision bearings or pneumatic systems, which require a solution that addresses the fine details of the equipment.

Metal Surfaces

One approach to preventing metal part corrosion is to store them with Volatile Corrosion Inhibitors (VCI) packaging. This type of packaging contains corrosion-inhibiting substances that create a chemical vapor and eventually form a thin, protective layer on the stored parts. The biggest challenge with VCI packaging is ensuring that it is airtight, which can be difficult to achieve on large components. This type of corrosion inhibitor becomes less effective with the ingress of air and moisture, which leads to rapid depletion of the inhibitor and results in corrosion.

A.W. Chesterton VCI-Preservation-Failures

VCI packing often leads to corrosion issues unless it is airtight.

The best method for protecting metal surfaces from corrosion is to apply a corrosion-preventative coating that will thwart degradation as a result of moisture and other environmental conditions. Chesterton’s 740 Heavy Duty Rust Guard is a self-healing protective coating that forms a waxy elastic film and is virtually impervious to moisture and corrosive vapors. The coating is durable and long-lasting, and can be expected to protect parts for up to two years. It is ideally suited for large components and coarse surfaces such as the heat exchangers, valves and piping noted above.

AW Chesterton inventory preservation

Protecting inventory from corrosion with Chesterton 740 Heavy Duty Rust Guard

Intricate Components and Precision Metallic Parts

Precision components such as bearings, electrical components, chains, and spindles should be protected with an ultra-thin, slightly oily, corrosion-inhibiting film. This type of film may not require removal before putting the component in service, depending upon the application. It can be easily sprayed on the components or applied by immersion/dipping.  This treatment will preserve components up to six months, depending upon environmental conditions.

A.W. Chesterton Restoring and Preserving Inventory

Equipment restored and then protected with Chesterton 775 Moisture Shield.

Non-Metallic Parts

Non-metallic parts such as plastic and other polymer components also need protection while in storage. Polymers such as rubber belts, O-Rings, and a variety of other plastics will decay due to ultraviolet (UV) heat and chemical vapor attack. For example, a rubber belt that hardens while in inventory will not have sufficient traction or gripping force, causing a reduction of energy transfer from the motor to the piece of equipment.

CASE STUDY: REFINERY SAVES $600K IN REFURBISHED INVENTORY PARTS

An oil refinery in a remote location had a large inventory exposed to extreme temperatures. Many metal parts became prematurely corroded over time, causing costly replacements. The parts were washed with a superior cleaner that removes rust and forms a layer of short-term corrosion protection protection. A heavy-duty rust guard was applied to provide long-term corrosion prevention for up to two years. Over $600,000 in spare parts originally destined for disposal were refurbished and saved over a two-year period.

Read the full case study.

Further, polymers that are used to seal electrical components such as conformal coatings may craze (micro-crack) and permit moisture to permeate the insulating varnish on PC boards. This results in short-outs.

Chesterton’s 730 Spragrip ® Belt Dressing is a waterproof solution that serves as a protection preservation system for rubber belting, O-Rings, and hoses.

Rigid polymers can be sealed and protected with Chesterton 421 Clear Protective Coating (CPC). This clear, hard-drying polymer is suitable for protection of electrical components.

CASE STUDY: HIGH-PERFORMANCE BELT DRESSING EXTENDS BALL MILL’S BELT LIFE BY 100%

A Rotary Ball Mill used to pulverize ceramic powder was driven by a set of 18 belts which had stretched and were slipping. A new set of belts cost $3K and on full day of lost production to install. By switching to a superior belt dressing, the plant was able to increase belt life by 100%. Application required only 10 minutes.

Read the full case study.

Inventory Rehabilitation / Recovery

For equipment and parts that have already suffered the effects of their storage environments, all is not lost in most cases!

Rust and oxidation can be removed, or it can be chemically transformed into a corrosion-inhibiting film. Once the oxidation is treated, a long-term preservative coating should be applied to prevent reoccurrence.

Chesterton’s 338 Super Rust Remover is a powerful solution that removes rust and oxidation while conditioning or passivating steel surfaces prior to the application of a long-term protective coating as mentioned above.

AW Chesterton Inventory preservation

Damaged inventory; restored inventory; protected inventory.

Developing an Equipment Preservation Plan

Here’s how Chesterton recommends approaching inventory protection and helps many companies directly:

1. Assess Current Inventory Value and Potential Losses Due to Decay:

The first step is to take an objective look at your current inventory to determine costs that go into loss/restoration today:

Determine the value of:

  1. Inventory in pristine condition,
  2. Inventory in marginally acceptable condition; and
  3. Inventory that is beyond repair and must be discarded.
  • Arrive at a cost estimate of the annual amount of non-repairable, non-recoverable inventory that must be discarded (considered scrap).
  • Determine a cost estimation for NOT PRESERVING/PROTECTING the current new and marginal inventory to your operation. What is the cost of rusted or otherwise compromised inventory if it results in lost equipment and premature failure? What is the cost of putting these items in service relative to long term performance and uptime?

This assessment should be a cross-departmental meeting so that everyone involved understands the issues and cost/performance implications. Next:

  • Secure group agreement on the need to better protect inventory
  • Arrive at an annual protection budget
  • Determine method for tracking a return on investment

2. Triage & Prioritize:

Separate your inventory into two areas:

  1. Equipment/parts that are salvageable with some restoration
  2. Equipment/parts which are in good enough condition to receive protection.

Prioritize which equipment needs addressing first and track progress in a spreadsheet. Set up your action plan (restorative plan) and schedule.

3. Determine the Correct Protection Technology: 

Next, break up these groups into equipment/part type as noted earlier and determine the best preservation method for each grouping. Your local supplier should be of assistance at this stage.

4. Purchase Materials, Accessories, and Schedule Manpower

Based upon the surface area to be preserved and protected OR restored, the selected technology needs to be purchased.  If applicable, order spray equipment, soak tanks, protective gear, and the like. Establish a convenient work area of sufficient size, set up tables, and plan for the manpower to implement the restoration/preservation plan.

A.W. Chesterton Inventory Preservation - Training

5. Proper Application/Training:

As with all systems, you’ll want to train staff to properly use the materials safely. The local supplier, application engineer, sales and service personnel should provide on-site training for plant personnel if the work is to be done in-house, or if your budget allows, provide a turn-key service.

6. Storage and Monitoring:

After preservation/restoration, the components should be monitored quarterly and corrective actions implemented if any re-occurrence of corrosion is observed.

A.W. Chesterton

Summary

Most marine, oil and gas exploration, and refining operations spend millions on their annual “buy” of new inventory.  It is crucial to preserve this investment.  With a deliberate and well thought-out equipment preservation plan, your operation will have quality inventory available in excellent condition when you need it.

Mark Guenther, Lubrication Specialist with Chesterton
Mark Guenther
Mark has worked with A.W. Chesterton Company for 40 years, extensively focusing on the practical understanding of equipment failure and corrective action plans. While at Chesterton, he has fulfilled many functions: Chemist, Technical Service/Application Engineering, Research and Development Manager and Educator. Mark’s philosophy is that providing value to our customer is the single most important contribution we can make.

Ways to Reduce the Use of Water in Mining

Related Articles

Related Whitepapers

Five Reasons To Choose A Bearingless Torque Sensor

Benefits that improve your torque measurements Best real-world accuracy Highest Overload Highest Overrange

Advanced Sealing and Condition Monitoring Strategies In Water and Wastewater Plants

Introduction As a plant/maintenance manager or reliability engineer for a water or wastewater facility, you want to know about the best technologies to help your…

Downthrust Measurement in Vertical Pumps Prevents Failure: The Benefits of Measuring Axial Force in Real-Time

“Himmelstein’s Thrustmeter has proven to be accurate and repeatable, which are two of the main things that define quality in an instrument. It’s been a…

Electricity, Power, and Emissions: Using Motor Power Data to Create a Climate-Informed Maintenance Plan

Take Action Today To Make Your Pumps More Efficient Pump motor power levels and energy consumption provide valuable input about the status of and changes…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *