Generic selectors
Exact matches only
Search in title
Search in content
Search in posts
Search in pages

Gas Seal for Propylene Services

A.W. Chesterton
A.W. Chesterton 4400 Gas Seal

Gas Seal for Propylene Services

Challenge

Propylene is a primary intermediate in the production of many plastic materials. It is a gas atmosphere and flammable and is a poor seal face lubricant. It is considered a volatile organic compound (VOC) and emissions are regulated by many governments.

This plant was using single seal with a steam quench to seal propylene. The quench kept the seal O-ring resilient during operation but added temperature to the single seal. This increased emissions and flashing resulted in reduced sealing performance.

The plant wanted to improve sealing reliability and eliminate any fugitive emissions.

A.W. Chesterton Dual 4400 Concentric Gas Seal (1)

Solution

The Chesterton 4400 Dual Concentric Gas Seal was installed in the propylene pump population.

  • Environmental Piping Plan 74 was installed to protect and control the gas supply to the seal
  • Plan 11 was also used to reduce the pressure in the stuffing box
  • The steam quench was eliminated because the Chesterton 4400 Gas Seal was fitted with FKM O-rings that maintained their resiliency without the need for added heat

A.W. Chesterton Dual 4400 Concentric Gas Seal

Results

  • The operation was able to eliminate fugitive emissions using the Chesterton 4400 Dual Concentric Gas Seal
  • Sealing reliability was significantly improved
  • The plant was also able to eliminate steam quench requirements and increase sealing

Related Articles

Related Whitepapers

Can Multiple-diaphragm Pumps Deliver “Pulse-less” Flow?

Metering pumps deliver a precise, though adjustable, amount of fluid into a chemical-feed system. They are designed for accuracy, so flow rates tend to be…

Benefits of Eddy Current Drives in Municipal Applications [Infographic]

Dynamatic eddy current drives offer many advantages over VFDs in applications requiring pumps to match a varying demand for flow or pressure. Download Dynamatic’s Municipal…

Selecting the Right Pump for your Quarry Application

Sand and Gravel Processing Operations have a lot of working parts. In this brochure from Tsurumi, they break the process down for you and help you…

Safe and Efficient Flare Gas Recovery

Steps all flare gas recovery operators should take to avoid unplanned downtime Safe and efficient operation of liquid ring compressors in flare gas recovery applications…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

Sign up for our Newsletter


By submitting this form, you are consenting to receive marketing emails from: Empowering Pumps & Equipment, 2205-C 7th Street, Tuscaloosa, AL, 35401, http://www.empoweringpumps.com. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact