Dewatering Pump Solution for Project in Qatar

AllightPrimax
dewatering pumps

Dewatering Pump Solution for Project in Qatar

When high volume dewatering pumps were required in Qatar, AllightPrimax supported their customer through the design phase, helping to make the right pump selection to meet pumping requirements and address potential corrosion and noise issues.

With a requirement of total pumping volume at around 2500 m3/hr, the team at Allightprimax pumping team proposed five CP220i units, each delivering 500 m3/hr with a total dynamic head of 35 M.

Read the full story!

Related Articles

Related Whitepapers

How to Read a Pump Curve (and Why you Want to)

If you have ever worked with pumps before, be it in an installation, maintenance, or engineering capacity, chances are high you have seen a pump…

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *