Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Pump Decisions for Gas Turbine Combined Cycle Power Plants Webinar

Motors & Drives
McIlvaine Company world logo

Pump Decisions for Gas Turbine Combined Cycle Power Plants Webinar

On September 11, McIlvaine will host a webinar that will be organizational and informative. It is part of a whole knowledge system for gas turbine combined cycle plant operators–Gas Turbine and Combined Cycle Decisions .   The webinar on the 11th will try to answer the most important and difficult decisions you will have to make regarding pumps.

Here are some of the questions which will be addressed:

  • Where do you use variable speed drives?
  • What type of boiler feedwater pump is best?
  • With fast start HRSGS and constant cycling what pump innovationss will counter some of the negative consequences of this operating mode?
  • What pump  issues facing GTCC operators which are unique to this type of power generation?
  • What are the pump needs if zero liquid discharge  technology is mandated?
  • What other questions are GTCC operators asking?

More Details: Thursdays at 10 a.m. Central time, McIlvaine hosts a 90 minute web meeting on important energy and pollution control subjects.  These Webinars are free of charge to owner/operators of the plants. They are also free to McIlvaine Subscribers of Power Plant Air Quality Decisions and Utility Tracking System.   The cost for others is $300.00 per webinar. 

Click here to view schedule and register!

Related Articles

Related Whitepapers

How to Read a Pump Curve (and Why you Want to)

If you have ever worked with pumps before, be it in an installation, maintenance, or engineering capacity, chances are high you have seen a pump…

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *