Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Reliable Water Supply For New York: Drinking Water For The Big Apple

KSB
KSB

Reliable Water Supply For New York: Drinking Water For The Big Apple

By: KSB

More than half of New York’s drinking water is conveyed to the city via the Rondout-West Branch Tunnel of the Delaware Aqueduct – a 71 kilometre-long tunnel which supplies up to 37 m³ of drinking water per second via a natural incline from Ulster County located 160 km away. Measuring over four metres in diameter, construction of the tunnel was completed in 1944. As a result of geological conditions, the tunnel was losing up to 130 million litres of drinking water a day through leaks under the Hudson River.

KSB

UPA submersible borehole pumps

KSB

Valve for water extraction: SISTO-16TWA

To enable the tunnel to be pumped empty for repairs as quickly as possible, KSB supplied the most powerful single-entry submersible borehole pumps that our company has ever produced. Each of the 5 units is driven by a 2,000 kW, 4-pole electric motor operating at a voltage of 4,160 volts. The output of each pump is around 2,000 cubic metres an hour at a maximum rated head of 320 metres. In accordance with the customer’s specifications, the components which come into contact with the fluid handled on selected pump sets are made of corrosion-resistant stainless steel. A special submersible connector system was used for the cable connections.

Related Articles

Related Whitepapers

How to Read a Pump Curve (and Why you Want to)

If you have ever worked with pumps before, be it in an installation, maintenance, or engineering capacity, chances are high you have seen a pump…

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *