Sewer System Restoration Design Provides Advantages and Savings

Crane Pumps & Systems

Sewer System Restoration Design Provides Advantages and Savings

In February 2010, Crane Pumps & Systems, CP&S, was invited to a meeting hosted by the Roamingwood Sewer and Water Authority and their engineering consultant, Cardno BCM, to discuss the failing gravity-based sewer system in Lake Ariel, Pennsylvania. The community includes a lake, a small ski resort, a golf course, and hiking and bicycle trails, all built on a rock foundation.

The existing 26 pumping stations included several different brands of pumps, an outrageous electrical consumption and they required continuous maintenance. The stations ranged in service life of less than 5 years old to being over 18 years old. Each duplex station had carried an initial $150,000 – $200,000 investment and now required replacement.

Crane Pumps & Systems provided Lake Ariel a low pressure sewer design that eliminated all of the lift stations and projected an $80,000 savings every year just in electrical costs. The new design included a Barnes EcoTRAN packaged system fitted with the Barnes Omni Grind grinder pump to be installed at each home site. The station is hidden under a tank cover disguised as a landscape garden rock. The newly designed pressure sewer system utilized much smaller pipe than a gravity-based system and eliminated the need for 40-foot open cuts through a neighborhood with pristine trees. The only entry points into the system from home site to treatment facility are the homes themselves. With no secondary leakage, treatment gets simpler, demands less energy and money, and is easier to predict what’s coming out the other end.

The sewer system restoration project was completed in 2015 with the support of CP&S representative, CW Sales. The Roamingwood Water Authority is pleased with the new design and will enjoy savings for years to come.

“Replacing the existing gravity/ pumped sewer system with an equivalent new system ‘in kind’ would have cost about 30-40 percent more than the pressure sewer system we are now constructing.” – Jack Lennox, RS&W’s Executive Director

Learn more about the Barnes EcoTran System.

Related Articles

Crane variable speed frequency drives Quick Start Guide

VFD Quick Start Guide

Using variable speed/frequency drives on wastewater pumps can be tricky, but if the drives are sized and programmed properly, they…

Related Whitepapers

Design Optimization of Jet Fuel Pump for Aviation

Jet fuel pumps play a critical role in the safe and efficient operation of commercial aviation. The performance and reliability of these pumps directly impact…

The Cost Of Downtime In Manufacturing [Infographic]

Downtime can be the most expensive element of any manufacturing operation. Here are some important facts and tips you should know to cut down on…

AFT Fathom used to Model Central Heating Cycle of a State-of-the-art Combined Heat and Power Plant

Kerem Algüzey, design engineer at ENKA Insaat ve Sanayi A.S., used AFT Fathom to simulate the central heating cycle to inform the design of the…

Driving Energy Savings a Commercial Facility Energy Upgrade Project

Upgrading to Design Envelope pumps helped GAC save energy costs of 20,000 AED in the first year. Armstrong’s Pump Manager service provides reports and notifications…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *